|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2025 Measured TD: 11817 ft. Vertical TD: 7452 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/27/2013 | | Proposed Top PZ Location: | Sec:16 Twp: 2N 67W | Footage: 728 FSL 2623 FEL | | Bottom Hole Location: | Sec:16 Twp: 2N 67W | Footage: 535 FNL 2603 FEL | | Proposed Depth/Form: | 11836 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 16 in., Size: 15 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 650 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7856 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 910, Top: , Bottom: 7856 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7706 ft., Depth: 11836 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 9/18/2012 | | Spud Date: | 9/8/2012 | Spud Date Is: | Actual | | Measured TD: | 11817 ft. | Measured PB depth: | 11809 ft. | | True Vertical TD: | 7452 ft. | True Vertical PB depth: | 7436 ft. | | Top PZ Location: | Sec:16 Twp: 2N 67W | Footage: 932 FSL 2716 FEL | | Bottom Hole Location: | Sec:16 Twp: 2N 67W | Footage: 576 FNL 2634 FEL | | Log Types: | CBL - PDF ATTACHED | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 75 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 744 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 402, Top: 0 ft., Bottom: 744 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7831 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 1960 ft., Bottom: 7831 ft., Determination Method: CALC | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7769 ft., Depth: 11817 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2766 ft. | | | | | PARKMAN | 4058 ft. | | | | | SUSSEX | 4548 ft. | | | | | SHANNON | 5505 ft. | | | | | TEEPEE BUTTES | 6699 ft. | | | | | NIOBRARA | 7473 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 6/1/2025 Interval Top: 8014 ft. Interval Bottom: 11739 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/15/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/7/2012 | Treatment End Date: | 10/7/2012 | | Treatment Summary: | FRAC'D W/2906648 GAL SILVERSTIM AND SLICK WATER, 3263495# OTTAWA SAND AND 271628# SB EXCEL | | Total fluid used in treatment (bbls): | 69206 | Max pressure during treatment (psi): | 6450 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | 3862 | Total flowback volume recovered (bbls): | 15620 | | Fresh water used in treatment (bbls): | 65344 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 3535123 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7731 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/21/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 478 | | BBLS_OIL | 229 | | BTU_GAS | 1261 | | CALC_BBLS_H2O | 478 | | CALC_BBLS_OIL | 229 | | CALC_GOR | 2817 | | CALC_MCF_GAS | 645 | | CASING_PRESS | 2250 | | GRAVITY_OIL | 47 | | MCF_GAS | 645 | | TUBING_PRESS | 1800 |
| | Perforation Data: | | Interval Top: | 8014 ft. | # Of Holes: | 0 | | Interval Bottom: | 11739 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 05/22/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 257 |
| Total Gas Produced (MCF) | 1296 |
| GOR | 5042 |
| GOR Determination | BOE |
| Average BOE per Day | 1.316 |
| Average MCFE per Day | 7.641 |
| Federal Financial Assurance | i | |
|
|