|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2024 Measured TD: 8574 ft. Vertical TD: 7990 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/26/2013 | | Proposed Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 2576 FNL 1322 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 2563 FNL 1322 FEL | | Proposed Depth/Form: | 8512 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8512 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 165, Top: 7487 ft., Bottom: 8512 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/29/2012 | | Spud Date: | 9/24/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8574 ft. | Measured PB depth: | 8520 ft. | | True Vertical TD: | 7990 ft. | True Vertical PB depth: | 7936 ft. | | Top PZ Location: | Sec:4 Twp: 3N 68W | Footage: 2576 FNL 1322 FEL | | Bottom Hole Location: | Sec:4 Twp: 3N 68W | Footage: 2563 FNL 1322 FEL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 714 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 725 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.625 in., Size: 4.5 in., Top: 0 ft., Depth: 8563 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 705, Top: 3020 ft., Bottom: 8574 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4595 ft. | | | | | NIOBRARA | 7686 ft. | | | | | CODELL | 7968 ft. | | | | | J SAND | 8431 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 8/1/2024 Interval Top: 8448 ft. Interval Bottom: 8468 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/7/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/1/2013 | Treatment End Date: | 4/1/2013 | | Treatment Summary: | Frac'd the J Sand with 101,300# 40/70 and 103,152 gals SLF. 04-01-13 | | Total fluid used in treatment (bbls): | 2456 | Max pressure during treatment (psi): | 5183 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.79 | | Recycled water used in treatment (bbls): | 2456 | Total flowback volume recovered (bbls): | 350 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 101300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8448 ft. | # Of Holes: | 40 | | Interval Bottom: | 8468 ft. | Hole Size: | 0.45 in. |
|
Formation CODL Formation Classification: GW Status: CM - 12/16/2013 Interval Top: 7971 ft. Interval Bottom: 7985 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/7/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/1/2013 | Treatment End Date: | 4/1/2013 | | Treatment Summary: | Set CFP @ 8035'. 04-01-13
Frac'd the Codell with 98,980# 40/70 sand and 101,808 gals SLF. 04-01-13 | | Total fluid used in treatment (bbls): | 2424 | Max pressure during treatment (psi): | 4728 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.79 | | Recycled water used in treatment (bbls): | 2424 | Total flowback volume recovered (bbls): | 350 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 98980 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7971 ft. | # Of Holes: | 42 | | Interval Bottom: | 7985 ft. | Hole Size: | 0.45 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/10/2013 Interval Top: 7687 ft. Interval Bottom: 8468 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/7/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/10/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 7640'. 04-05-13
Drilled up CBP and CFP's to commingle the JSND-NBRR-CDL. 04-06-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8431 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/10/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 44 | | BBLS_OIL | 90 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 44 | | CALC_BBLS_OIL | 90 | | CALC_GOR | 2878 | | CALC_MCF_GAS | 259 | | CASING_PRESS | 1777 | | GRAVITY_OIL | 70 | | MCF_GAS | 259 | | TUBING_PRESS | 1006 |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 198 | | Interval Bottom: | 8468 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 8/1/2024 Interval Top: 7687 ft. Interval Bottom: 7985 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/7/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 158 | | Interval Bottom: | 7985 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/16/2013 Interval Top: 7687 ft. Interval Bottom: 7773 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/7/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/1/2013 | Treatment End Date: | 4/1/2013 | | Treatment Summary: | Set CFP @ 7825'. 04-01-13
Frac'd the Niobrara with 101,000# 40/70 sand and 100,842 gals SLF. 04-01-13 | | Total fluid used in treatment (bbls): | 2425 | Max pressure during treatment (psi): | 4898 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 2425 | Total flowback volume recovered (bbls): | 350 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 101000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 116 | | Interval Bottom: | 7773 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/19/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 07/31/2024 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|