|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/27/2023 Measured TD: 6983 ft. Vertical TD: 6869 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/27/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/26/2013 | Proposed Top PZ Location: | Sec:18 Twp: 4N 63W | Footage: 1359 FNL 1311 FEL | Bottom Hole Location: | Sec:18 Twp: 4N 63W | Footage: 1361 FNL 1300 FEL | Proposed Depth/Form: | 6999 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: NE/4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: NE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 600 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6999 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: , Bottom: 6999 ft. |
| | |
Wellbore Completed | Completion Date: | 12/4/2011 | Spud Date: | 12/2/2011 | Spud Date Is: | ACTUAL | Measured TD: | 6983 ft. | Measured PB depth: | 6930 ft. | True Vertical TD: | 6869 ft. | True Vertical PB depth: | 6816 ft. | Top PZ Location: | Sec:18 Twp: 4N 63W | Footage: 1359 FNL 1311 FEL | Bottom Hole Location: | Sec:18 Twp: 4N 63W | Footage: 1361 FNL 1300 FEL | Log Types: | CBL/GR/CCL, CN/GR, HRI | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 654 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 259, Top: 0 ft., Bottom: 654 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6973 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 1496 ft., Bottom: 6973 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6393 ft. | | | | FORT HAYS | 6656 ft. | | | | CODELL | 6679 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 4/4/2022 Interval Top: 6799 ft. Interval Bottom: 6811 ft. Completed Information for Formation CODELL | 1st Production Date: | 1/7/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6799 ft. | # Of Holes: | 48 | Interval Bottom: | 6811 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/27/2023 Interval Top: 6609 ft. Interval Bottom: 6811 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/7/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/5/2012 | Treatment Summary: | Niobrara perfs 6609-6696 (48 holes). Codell perfs 6799-6811 (48 holes).
Frac'd Niobrara and Codell with 267,695 gals of Slick Water, Silverstim, and 15% HCI with 454,047#'s of Ottawa sand.
Commingle Codell and Niobrara.
Codell producing through flow plug. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 40 | BBLS_OIL | 42 | BTU_GAS | 1304 | CALC_BBLS_H2O | 40 | CALC_BBLS_OIL | 42 | CALC_GOR | 4833 | CALC_MCF_GAS | 203 | CASING_PRESS | 260 | GRAVITY_OIL | 51 | MCF_GAS | 203 |
| Perforation Data: | Interval Top: | 6609 ft. | # Of Holes: | 96 | Interval Bottom: | 6811 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 4/4/2022 Interval Top: 6609 ft. Interval Bottom: 6696 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 1/7/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6609 ft. | # Of Holes: | 48 | Interval Bottom: | 6696 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 11/27/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|