|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2020 Measured TD: 11188 ft. Vertical TD: 6663 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/26/2013 | Prop Depth/Form: | 11186 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: unspaced , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 16 in., Size: 15 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 775 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 396, Top: 0 ft., Bottom: 775 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7114 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 985, Top: , Bottom: 7114 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5901 ft., Depth: 11186 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 2/12/2012 | Spud Date: | 2/3/2012 | Spud Date Is: | ACTUAL | Measured TD: | 11188 ft. | Measured PB depth: | 11170 ft. | True Vertical TD: | 6663 ft. | True Vertical PB depth: | 6645 ft. | Top PZ Location: | Sec:7 Twp: 6N 63W | Footage: 2645 FSL 563 FWL | Depth | Bottom Hole Location: | Sec:7 Twp: 6N 63W | Footage: 2721 FSL 543 FEL | Depth | Log Types: | CBL/GRL/CCL/VDL. | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 24 ft., Depth: 124 ft., Weight: 75 , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 24 ft., Depth: 873 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 421, Top: 0 ft., Bottom: 873 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 24 ft., Depth: 7116 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 585, Top: 820 ft., Bottom: 7116 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7004 ft., Depth: 11170 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4469 ft. | | | | SHANNON | 5148 ft. | | | | NIOBRARA | 6752 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 6/1/2020 Interval Top: 7257 ft. Interval Bottom: 11091 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/22/2012 | Choke Size: | 0.000 in. | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/8/2012 | Treatment Summary: | Frac'd the Niobrara w/ 2977866 gals of Silverstim and Slick Water with 3,836,000#'s of Ottawa sand. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/30/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 395 | BBLS_OIL | 450 | BTU_GAS | 1369 | CALC_BBLS_H2O | 395 | CALC_BBLS_OIL | 450 | CALC_GOR | 1420 | CALC_MCF_GAS | 639 | CASING_PRESS | 5 | GRAVITY_OIL | 46 | MCF_GAS | 639 | TUBING_PRESS | 940 |
| Perforation Data: | Interval Top: | 7257 ft. | # Of Holes: | 0 | Interval Bottom: | 11091 ft. | Hole Size: | 0 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 4310 |
Total Gas Produced (MCF) | 38562 |
GOR | 8947 |
GOR Determination | BOE |
Average BOE per Day | 29.988 |
Average MCFE per Day | 173.940 |
Federal Financial Assurance | i | |
|
|