Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34595
Well Classification: GW Status: SI - 8/1/2022
Well Name/No:CAMENISCH #11-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2022
FacilityID:426154LocationID:318184
County:WELD #123Location:SWSW 2 1N67W 6
Field:WATTENBERG - #90750Elevation:5032 ft.
Planned Location:1018FSL  1050 FWLLat/Long: 40.075572 / -104.863678Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.075575 / -104.863680Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/29/2013
End Date: 5/29/2013
Reported: 7/19/2013
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2022             Measured TD: 8382 ft.    Vertical TD: 8261 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/22/2013
Proposed Top PZ Location:Sec:2 Twp: 1N 67W Footage: 1980 FSL  1980 FWL
Bottom Hole Location:Sec:2 Twp: 1N 67W Footage: 1980 FSL  1980 FWL
Proposed Depth/Form:8405 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24.0 , Citings Type: PLANNED
Cement:Sacks: 630, Top: , Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8405 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8405 ft.

Wellbore Completed
Completion Date:10/23/2012
Spud Date:10/19/2012Spud Date Is:ACTUAL
Measured TD:8382 ft.Measured PB depth:8100 ft.
True Vertical TD:8261 ft.True Vertical PB depth:7979 ft.
Top PZ Location:Sec:2 Twp: 1N 67WFootage: 1873 FSL  1863 FWL
Bottom Hole Location:Sec:2 Twp: 1N 67WFootage: 1852 FSL  1880 FWL
Log Types:PRE FORM 5
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 926 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 0 ft., Bottom: 926 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8382 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 42, Top: 8130 ft., Bottom: 8382 ft., Determination Method: CALC
Additional Cement:String Type: 1ST , Top: 736 ft., Depth: 8166 ft., Bottom: 8166 ft., Sacks: 995, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 920 ft., Depth: 8100 ft., Bottom: 8100 ft., Sacks: 995, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4427 ft.
SUSSEX4830 ft.
NIOBRARA7481 ft.
FORT HAYS7765 ft.
CODELL7788 ft.
J SAND8216 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/27/2013                 Interval Top: 7784 ft.    Interval Bottom: 7804 ft.

 Completed Information for Formation CODELL
1st Production Date:6/5/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/29/2013Treatment End Date:5/29/2013
Treatment Summary:4794 BBL SLICKWATER, 4794 BBL TOTAL FLUID. 151600# 30/50 SAND, 4000# 20/40 SAND, 155600# TOTAL SAND.
Total fluid used in treatment (bbls):4794Max pressure during treatment (psi):5338
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):479
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):155600Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7784 ft.# Of Holes:60
Interval Bottom:7804 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 8/1/2022                  Interval Top: 7558 ft.    Interval Bottom: 7804 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/5/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/12/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 27
BTU_GAS 1290
CALC_BBLS_OIL 27
CALC_GOR 2148
CALC_MCF_GAS 58
CASING_PRESS 1076
GRAVITY_OIL 50
MCF_GAS 58
Perforation Data:
Interval Top:7558 ft.# Of Holes:122
Interval Bottom:7804 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 9/27/2013                 Interval Top: 7558 ft.    Interval Bottom: 7652 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/5/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/29/2013Treatment End Date:5/28/2013
Treatment Summary:5858 BBL SLICKWATER, 5858 BBL TOTAL FLUID. 200280# 30/50 SAND, 4000# 20/40 SAND, 204280# TOTAL SAND.
Total fluid used in treatment (bbls):5858Max pressure during treatment (psi):5011
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):479
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):204280Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7558 ft.# Of Holes:62
Interval Bottom:7652 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
07/31/2022
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No