|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/19/2018 Measured TD: 8060 ft. Vertical TD: 7921 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/19/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/19/2013 | | Proposed Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 510 FSL 660 FWL | | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 510 FSL 660 FWL | | Proposed Depth/Form: | 8036 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8036 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 167, Top: 6998 ft., Bottom: 8036 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4927 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 83, Top: 4327 ft., Bottom: 4927 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/6/2012 | | Spud Date: | 5/1/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8060 ft. | Measured PB depth: | 7992 ft. | | True Vertical TD: | 7921 ft. | True Vertical PB depth: | 7853 ft. | | Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 582 FSL 550 FWL | | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 581 FSL 544 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 877 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 877 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8048 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 3846 ft., Bottom: 8048 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4596 ft. | | | | | NIOBRARA | 7261 ft. | | | | | CODELL | 7445 ft. | | | | | J SAND | 7878 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/27/2018 Interval Top: 7878 ft. Interval Bottom: 7921 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/20/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/10/2012 | | Treatment Summary: | Frac'd the J-Sand 7878’– 7890’, 7909’- 7921’ (48 holes) w/ 118,230 gal 18 #
pHaserFrac Hybrid cross linked gel containing 249,670# 20/40 Sand. 05-30-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7878 ft. | # Of Holes: | 48 | | Interval Bottom: | 7921 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/1/2012 Interval Top: 7445 ft. Interval Bottom: 7459 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/20/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/10/2012 | | Treatment Summary: | Set CFP @ 7522'. 05-31-12
Frac Codell 7445’ – 7459’, (42 holes) w/ 89,922 gal 22 # pHaserFrac Hybrid cross
linked gel containing 246,900 # 30/50 sand. 06-01-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7445 ft. | # Of Holes: | 42 | | Interval Bottom: | 7459 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/30/2012 Interval Top: 7321 ft. Interval Bottom: 7921 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/20/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/30/2012 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 6900'. 07-17-12
Drilled out CBP @ 6900, CFP @ 7373', 7522' to commingle the JSND-NBRR-CDL. 07-19-12 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7848 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/30/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 43 | | BBLS_OIL | 34 | | BTU_GAS | 1248 | | CALC_BBLS_H2O | 43 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 10059 | | CALC_MCF_GAS | 342 | | CASING_PRESS | 1160 | | GRAVITY_OIL | 48 | | MCF_GAS | 342 | | TUBING_PRESS | 528 |
| | Perforation Data: | | Interval Top: | 7321 ft. | # Of Holes: | 138 | | Interval Bottom: | 7921 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/27/2018 Interval Top: 7321 ft. Interval Bottom: 7459 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7321 ft. | # Of Holes: | 90 | | Interval Bottom: | 7459 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/1/2012 Interval Top: 7321 ft. Interval Bottom: 7333 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/20/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/10/2012 | | Treatment Summary: | Set CFP @ 7373'. 06-10-12
Frac'd the Niobrara 7321’ – 7333’ (48 holes), w/ 98,742 gals 18 # pHaserFrac Hybrid
cross linked gel containing 250,120# 30/50 High Crush Wisconsin sand. 06-10-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7321 ft. | # Of Holes: | 48 | | Interval Bottom: | 7333 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/27/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|