|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/19/2018 Measured TD: 7995 ft. Vertical TD: 7917 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/19/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/19/2013 | | Proposed Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 2130 FSL 660 FWL | | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 2130 FSL 660 FWL | | Proposed Depth/Form: | 7974 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7974 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 167, Top: 6934 ft., Bottom: 7974 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4913 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 83, Top: 4313 ft., Bottom: 4913 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/30/2012 | | Spud Date: | 4/25/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7995 ft. | Measured PB depth: | 7922 ft. | | True Vertical TD: | 7917 ft. | True Vertical PB depth: | 7844 ft. | | Top PZ Location: | Sec:17 Twp: 2N 65W | Footage: 2099 FSL 624 FWL | | Bottom Hole Location: | Sec:17 Twp: 2N 65W | Footage: 2099 FSL 619 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 872 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 872 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7980 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 3318 ft., Bottom: 7980 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4552 ft. | | | | | NIOBRARA | 7090 ft. | | | | | CODELL | 7372 ft. | | | | | J SAND | 7822 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 3/18/2019 Interval Top: 7822 ft. Interval Bottom: 7862 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/19/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/10/2012 | | Treatment Summary: | Frac'd the J-Sand 7822’– 7834’, 7850’- 7862’ (48 holes) w/ 119,910 gal 18 #
pHaserFrac Hybrid cross linked gel containing 250,240# 20/40 Sand. 05-30-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7822 ft. | # Of Holes: | 48 | | Interval Bottom: | 7862 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/5/2012 Interval Top: 7372 ft. Interval Bottom: 7386 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/19/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/10/2012 | | Treatment Summary: | Set CFP @ 7454'. 05-31-12
Frac'd the Codell 7372’ – 7386’, (42 holes) w/ 89,124 gal 22 # pHaserFrac Hybrid cross
linked gel containing 249,720 # 30/50 sand. 06-10-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7372 ft. | # Of Holes: | 42 | | Interval Bottom: | 7386 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/30/2012 Interval Top: 7148 ft. Interval Bottom: 7862 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/16/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/30/2012 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 6500'. 07-16-12
Drilled out CBP @ 6500, CFP @ 7210', 7454' to commingle the JSND-NBRR-CDL. 07-17-12 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7804 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/30/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 43 | | BBLS_OIL | 39 | | BTU_GAS | 1248 | | CALC_BBLS_H2O | 43 | | CALC_BBLS_OIL | 39 | | CALC_GOR | 7436 | | CALC_MCF_GAS | 290 | | CASING_PRESS | 880 | | GRAVITY_OIL | 48 | | MCF_GAS | 290 | | TUBING_PRESS | 390 |
| | Perforation Data: | | Interval Top: | 7148 ft. | # Of Holes: | 138 | | Interval Bottom: | 7862 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/18/2019 Interval Top: 7148 ft. Interval Bottom: 7386 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7148 ft. | # Of Holes: | 90 | | Interval Bottom: | 7386 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/5/2012 Interval Top: 7148 ft. Interval Bottom: 7160 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/16/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/10/2012 | | Treatment Summary: | Set CFP @ 7210'. 06-10-12
Frac'd the Niobrara 7148’ – 7160’ (48 holes), w/ 100,044 gals 18 # pHaserFrac Hybrid
cross linked gel containing 254,860# 30/50 sand. 06-10-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7148 ft. | # Of Holes: | 48 | | Interval Bottom: | 7160 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/18/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|