|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2023 Measured TD: 11110 ft. Vertical TD: 6734 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/5/2013 | Prop Depth/Form: | 10927 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 775 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 410, Top: 0 ft., Bottom: 775 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7081 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 993, Top: , Bottom: 7081 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 10927 ft., Depth: 5868 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: 10927 ft. |
| | |
Wellbore Completed | Completion Date: | 2/2/2012 | Spud Date: | 1/26/2012 | Spud Date Is: | ACTUAL | Measured TD: | 11110 ft. | Measured PB depth: | 11080 ft. | True Vertical TD: | 6734 ft. | True Vertical PB depth: | 6704 ft. | Top PZ Location: | Sec:33 Twp: 7N 63W | Footage: 640 FNL 768 FWL | Depth | Bottom Hole Location: | Sec:33 Twp: 7N 63W | Footage: 673 FNL 537 FEL | Depth | Log Types: | CBL/GRL/CCL/VDL.
No other logs sent at this time. | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 24 ft., Depth: 124 ft., Weight: 84.00 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 124 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 24 ft., Depth: 846 ft., Weight: 36.00 , Citings Type: ACTUAL | Cement: | Sacks: 428, Top: 0 ft., Bottom: 856 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 24 ft., Depth: 7029 ft., Weight: 26.00 , Citings Type: ACTUAL | Cement: | Sacks: 925, Top: 640 ft., Bottom: 7039 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6918 ft., Depth: 11080 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2620 ft. | | | | PARKMAN | 3709 ft. | | | | SUSSEX | 4506 ft. | | | | SHANNON | 5128 ft. | | | | NIOBRARA | 6722 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2023 Interval Top: 7109 ft. Interval Bottom: 11010 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/3/2012 | Choke Size: | 0.000 in. | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/12/2012 | Treatment Summary: | Frac'd the Niobrara w/ 2732975 gals of Silverstim and Slick Water with 3,806,702#'s of Otawa sand. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6411 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/18/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 171 | BBLS_OIL | 208 | BTU_GAS | 1316 | CALC_BBLS_H2O | 171 | CALC_BBLS_OIL | 208 | CALC_GOR | 610 | CALC_MCF_GAS | 127 | CASING_PRESS | 225 | GRAVITY_OIL | 41 | MCF_GAS | 127 |
| Perforation Data: | Interval Top: | 7109 ft. | # Of Holes: | 0 | Interval Bottom: | 11010 ft. | Hole Size: | 0 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5234 |
Total Gas Produced (MCF) | 14610 |
GOR | 2791 |
GOR Determination | BOE |
Average BOE per Day | 21.201 |
Average MCFE per Day | 122.949 |
Federal Financial Assurance | i | |
|
|