|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2021 Measured TD: 11895 ft. Vertical TD: 7414 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/29/2013 | Proposed Top PZ Location: | Sec:27 Twp: 3N 66W | Footage: 626 FSL 1695 FWL | Bottom Hole Location: | Sec:27 Twp: 3N 66W | Footage: 460 FNL 1695 FWL | Proposed Depth/Form: | 11902 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: W2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7763 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 740, Top: , Bottom: 7763 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6709 ft., Depth: 11902 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 2/21/2012 | Spud Date: | 2/6/2012 | Spud Date Is: | ACTUAL | Measured TD: | 11895 ft. | Measured PB depth: | 11885 ft. | True Vertical TD: | 7414 ft. | True Vertical PB depth: | 7414 ft. | Top PZ Location: | Sec:27 Twp: 3N 66W | Footage: 678 FSL 1753 FWL | Bottom Hole Location: | Sec:27 Twp: 3N 66W | Footage: 466 FNL 1624 FWL | Log Types: | PRELIMINARY FORM 5 | Log Types: | CBL; HZ; NFE-GR | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 889 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 660, Top: 0 ft., Bottom: 889 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7844 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 754, Top: 0 ft., Bottom: 7844 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6769 ft., Depth: 11885 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 7160 ft. | | | | NIOBRARA | 7236 ft. | | | | FORT HAYS | 7630 ft. | | | | CODELL | 7835 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 5/1/2021 Interval Top: 7890 ft. Interval Bottom: 11816 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/26/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 5/15/2012 | Treatment Summary: | FRAC'D THROUGH AN OPEN HOLE LINER FROM 7890-11816. AVERAGE TREATING PRESSURE 4749, AVERAGE RATE 56, TOTAL BBLS OF FLUID 61158, TOTAL SAND WEIGHT 2774086. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7305 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/5/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 200 | BTU_GAS | 1276 | CALC_BBLS_OIL | 200 | CALC_GOR | 2340 | CALC_MCF_GAS | 468 | CASING_PRESS | 2074 | GRAVITY_OIL | 52 | MCF_GAS | 468 | TUBING_PRESS | 1228 |
| Perforation Data: | Interval Top: | 7890 ft. | # Of Holes: | | Interval Bottom: | 11816 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1305 |
Total Gas Produced (MCF) | 24322 |
GOR | 18637 |
GOR Determination | MCFE |
Average BOE per Day | 15.035 |
Average MCFE per Day | 87.191 |
Federal Financial Assurance | i | |
|
|