|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2024 Measured TD: 12109 ft. Vertical TD: 7480 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/21/2013 | Proposed Top PZ Location: | Sec:28 Twp: 1N 66W | Footage: 770 FSL 1991 FEL | Bottom Hole Location: | Sec:28 Twp: 1N 66W | Footage: 460 FNL 1980 FEL | Proposed Depth/Form: | 11938 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-477 , Unit Acreage: 160, Drill Unit: W/2E/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1330 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 390, Top: 0 ft., Bottom: 1330 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7878 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 720, Top: 0 ft., Bottom: 7878 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6623 ft., Depth: 11938 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 1/13/2012 | Spud Date: | 12/27/2011 | Spud Date Is: | ACTUAL | Measured TD: | 12109 ft. | Measured PB depth: | 12093 ft. | True Vertical TD: | 7480 ft. | True Vertical PB depth: | 7464 ft. | Top PZ Location: | Sec:28 Twp: 1N 66W | Footage: 623 FSL 2028 FEL | Bottom Hole Location: | Sec:28 Twp: 1N 66W | Footage: 463 N 1988 E | Log Types: | MUD, LWD, OH, FMI, CBL | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1339 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 1339 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7905 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 724, Top: 1240 ft., Bottom: 7905 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6897 ft., Depth: 12094 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4852 ft. | | | | NIOBRARA | 7328 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 9/1/2024 Interval Top: 7970 ft. Interval Bottom: 12023 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/2/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 3/17/2012 | Treatment Summary: | FRAC'D THROUGH AN OPEN HOLE LINER FROM 7970-12023. AVERAGE TREATING PRESSURE 4966, AVERAGE RATE 56.2, TOTAL BBLS OF FLUID 76567, TOTAL SAND WEIGHT 3542400. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/11/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 290 | BTU_GAS | 1258 | CALC_BBLS_OIL | 290 | CALC_GOR | 1072 | CALC_MCF_GAS | 311 | CASING_PRESS | 1514 | GRAVITY_OIL | 44 | MCF_GAS | 311 | TUBING_PRESS | 1015 |
| Perforation Data: | Interval Top: | 7970 ft. | # Of Holes: | | Interval Bottom: | 12023 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3069 |
Total Gas Produced (MCF) | 12136 |
GOR | 3954 |
GOR Determination | BOE |
Average BOE per Day | 14.110 |
Average MCFE per Day | 81.858 |
Federal Financial Assurance | i | |
|
|