|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/8/2024 Measured TD: 8431 ft. Vertical TD: 7304 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/8/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/14/2013 | | Proposed Top PZ Location: | Sec:25 Twp: 7N 65W | Footage: 1039 FNL 833 FEL | | Bottom Hole Location: | Sec:25 Twp: 7N 65W | Footage: 966 FNL 719 FEL | | Proposed Depth/Form: | 8413 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: unspaced , Unit Acreage: 80, Drill Unit: E/2NE4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: unspaced , Unit Acreage: 80, Drill Unit: E/2NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 288, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8413 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 830, Top: , Bottom: 8413 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/13/2011 | | Spud Date: | 11/8/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8431 ft. | Measured PB depth: | 8379 ft. | | True Vertical TD: | 7304 ft. | True Vertical PB depth: | 7252 ft. | | Top PZ Location: | Sec:25 Twp: 7N 65W | Footage: 1039 FNL 833 FEL | | Bottom Hole Location: | Sec:25 Twp: 7N 65W | Footage: 966 FNL 719 FEL | | Log Types: | Triple Combo, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 740 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 307, Top: 0 ft., Bottom: 740 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8421 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 1360 ft., Bottom: 8421 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7904 ft. | | | | | FORT HAYS | 8206 ft. | | | | | CODELL | 8232 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 6/11/2021 Interval Top: 8232 ft. Interval Bottom: 8248 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/7/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/8/2011 | | Treatment Summary: | The Codell is producing through a composite flow through plug
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8232 ft. | # Of Holes: | 64 | | Interval Bottom: | 8248 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/8/2024 Interval Top: 7924 ft. Interval Bottom: 8248 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/7/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 14 | | BTU_GAS | 1283 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 14 | | CALC_GOR | 286 | | CALC_MCF_GAS | 4 | | CASING_PRESS | 553 | | GRAVITY_OIL | 45 | | MCF_GAS | 4 |
| | Perforation Data: | | Interval Top: | 7924 ft. | # Of Holes: | 112 | | Interval Bottom: | 8248 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 6/11/2021 Interval Top: 7924 ft. Interval Bottom: 8069 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/7/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7924 ft. | # Of Holes: | 48 | | Interval Bottom: | 8069 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/08/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|