Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34369
Well Classification: GW Status: PR - 3/1/2025
Well Name/No:GRATTAN #4A-30H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BISON IV OPERATING LLC - 10670
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:425389LocationID:425380
County:WELD #123Location:SESE 30 2N64W 6
Field:WATTENBERG - #90750Elevation:4933 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:621FSL  461 FELLat/Long: 40.104020 / -104.585910Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.104036 / -104.585914Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/16/2012
End Date: 4/16/2012
Reported: 6/14/2012
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2025             Measured TD: 10980 ft.    Vertical TD: 6952 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/14/2013
Proposed Top PZ Location:Sec:30 Twp: 2N 64W Footage: 1220 FSL  533 FEL
Bottom Hole Location:Sec:30 Twp: 2N 64W Footage: 436 FNL  848 FEL
Proposed Depth/Form:11574 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: CONDUCTOR, Hole Size: 23 in., Size: 17 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 960 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 960 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 8 in., Top: 0 ft., Depth: 7359 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 899, Top: 500 ft., Bottom: 7359 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11574 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 373, Top: 7059 ft., Bottom: 11574 ft.

Wellbore Completed
Completion Date:3/12/2012
Spud Date:2/29/2012Spud Date Is:ACTUAL
Measured TD:10980 ft.Measured PB depth:10902 ft.
True Vertical TD:6952 ft.True Vertical PB depth:6955 ft.
Top PZ Location:Sec:30 Twp: 2N 64WFootage: 1220 FSL  533 FEL
Bottom Hole Location:Sec:30 Twp: 2N 64WFootage: 436 FNL  848 FEL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1023 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1023 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7375 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 0 ft., Bottom: 7375 ft., Determination Method: VISU
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 10980 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 5842 ft., Bottom: 10980 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6841 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 3/1/2025                  Interval Top: 7637 ft.    Interval Bottom: 10865 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/1/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/16/2012
Treatment Summary:Grattan 4A-30H Totals: 14 Stages: 61,951 BBLS Total Fluid - 244,453# 40/70, 3,177,542# 30/50, 156,323# 20/40 3,578,318# Total Sand. FRAC STG 1 WITH 24 BBLS 15% HCL, 1392 BBLS SW, 2746 BBLS SILVERSTIM 28# X/L GEL, 4327 BBLS TOTAL FLUID. STAGE 1 PUMPDOWN 165 BBLS (INCLUDED IN TOTAL FLUID). PLACED 17,682# 40/70, 218,463# 30/50, 13,002# 20/40, 249,146# TOTAL SAND. SET CFP 1 AT 10,671. Frac stage 2 with 24 bbls 15% HCL, 1361 Bbls slick water, 2748 bbls Silver Stim 28# XL.place 17,394# 40/70, 220,897# 30/50, and 13,012# 20/40 sand, (251,302# total). Set CFP 10,425. Frac stage 3 with 24 bbls 15% HCL, 1356 bbls. slickwater, 2743 bbls. Silver Stim 28# XL. Placed 17,390# 40/70, 220,969# 30/50, and 13,028# 20/40 sand.(251,387# total). Set CFP @10,174'. FRAC STG 4 WITH 24 BBLS 15% HCL, 1361 BBLS SW, 2729 BBLS SILVERSTIM 28# X/L GEL, 4237 BBLS TOTAL FLUID. STAGE 4 PUMPDOWN 123 BBLS (INCLUDED IN TOTAL FLUID). PLACED 17,234# 40/70, 220,001# 30/50, 13,099# 20/40, 250,334# TOTAL SAND. SET CFP 4 AT 9,918'. FRAC STG 5 WITH 24 BBLS 15% HCL, 1396 BBLS SW, 2951 BBLS SILVERSTIM 28# X/L GEL, 4476 BBLS TOTAL FLUID. STAGE 5 PUMPDOWN 104 BBLS (INCLUDED IN TOTAL FLUID). PLACED 4,512# 40/70, 170,995# 30/50, NO# 20/40, 175,506# TOTAL SAND. SET CFP 5 AT 9,681'. frac stage 6 with 24 bbls 15% HCL, 1347 bbls SW, 2700 bbls Silver Stim 28# XL placing 17,382# 40/70, and 220,728# 30/50 sand. (238,110# total sand). Set stage 7 CFP @ 9428'. Frac stage 7 with 24 Bbls 15% HCL, 1349 bbls SW, 2729 Bbls Silver Stim XL and 17,390# 40/70, 220,708# 30/50, and 13,021# 20/40 sand.(251,119# total sand). Set stage 8 CFP @ 9175'. Frac stage 8 with 24 bbls 15% HCL, 1337 bbls SW, 2740 BBls Silver Stim placing 17,353# 40/70, 222,158# 30/50, and 13,003# 20/40 sand (total sand 252,514#). SET CFP 8 AT 8925'. FRAC STG 9 WITH 24 BBLS 15% HCL, 1380 BBLS SW, 2735 BBLS SILVERSTIM 28# X/L GEL, 4221 BBLS TOTAL FLUID. STAGE 9 PUMPDOWN 82 BBLS (INCLUDED IN TOTAL FLUID). PLACED 17,316# 40/70, 220,575# 30/50, 12,641# 20/40, 250,531# TOTAL SAND. SET CFP 9 AT 8676'. FRAC STG 10 WITH 24 BBLS 15% HCL, 1390 BBLS SW, 3371 BBLS SILVERSTIM 28# X/L GEL, 4848 BBLS TOTAL FLUID. STAGE 10 PUMPDOWN 63 BBLS (INCLUDED IN TOTAL FLUID). PLACED 17,754# 40/70, 228,941# 30/50, 13,109# 20/40, 259,803# TOTAL SAND. SET CFP 10 AT 8423'. Frac stage 11 with 24 bbls acid, 1334 bbls. SW, and 2722Bbls Silver Stim, placing 17,355# 40/70, 220,0499# 30/50, and 13,056# 20/40 sand. (total sand 250,910#) Set CFP @ 8177'. Frac stage 12 with 1582 Bbls SW, 3217 bbls. 28# Silver Stim, placing 20,786# 40/70 sand, 264,412# 30/50 sand, and 15,664# 20/40 sand. (total sand 300,862#). Set CFP @ 7887', Frac stage 13 with 1546 bbls SW, 3316 Bbls Silver Stim, placing 23,679# 40/70, 263,735# 30/50, and 15,397# 20/40 sand. (total sand 302,811#). Set CFP @ 7596' .FRAC STG 14 WITH 24 BBLS 15% HCL, 1555 BBLS SW, 3238 BBLS SILVERSTIM 28# X/L GEL, 4817 BBLS TOTAL FLUID. PLACED 21,230# 40/70, 264,464# 30/50, 8289# 20/40, 293,983# TOTAL SAND. Set CBP @ 6390'. Drilled out CBP @ 6390'. CFP @ 7596', 7887', 8177', 8423', 8626',8925', 9175'. 04-24-12. Drilled out CFP @ 9428', 9681', 9918', 10174', 10425', 10621'. 04-25-12
Tubing Size:2.375 in.Tubing Setting Depth:7122 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 632
BBLS_OIL 257
BTU_GAS 1372
CALC_BBLS_H2O 632
CALC_BBLS_OIL 257
CASING_PRESS 1450
GRAVITY_OIL 43
TUBING_PRESS 1050
Perforation Data:
Interval Top:7637 ft.# Of Holes:730
Interval Bottom:10865 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1291
Total Gas Produced (MCF)3596
GOR2785
GOR DeterminationBOE
Average BOE per Day5.191
Average MCFE per Day30.110

 Federal Financial Assurance  i 

 Tribal Well  i No