Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34363
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:CLARK #35N-11HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:425379LocationID:425386
County:WELD #123Location:NWNW 11 1N66W 6
Field:WATTENBERG - #90750Elevation:5105 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:480FNL  470 FWLLat/Long: 40.071857 / -104.752041Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.071857 / -104.752040Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/30/2012
End Date: 9/30/2012
Reported: 11/14/2012
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 11982 ft.    Vertical TD: 7385 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/14/2013
Proposed Top PZ Location:Sec:11 Twp: 1N 66W Footage: 618 FNL  1321 FWL
Bottom Hole Location:Sec:11 Twp: 1N 66W Footage: 460 FSL  1320 FWL
Proposed Depth/Form:11893 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1190 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 1190 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7653 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 730, Top: , Bottom: 7653 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6612 ft., Depth: 11893 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/11/2012
Spud Date:2/29/2012Spud Date Is:ACTUAL
Measured TD:11982 ft.Measured PB depth:11971 ft.
True Vertical TD:7385 ft.True Vertical PB depth:7385 ft.
Top PZ Location:Sec:11 Twp: 1N 66WFootage: 691 FNL  1331 FWL
Bottom Hole Location:Sec:11 Twp: 1N 66WFootage: 480 FSL  1321 FWL
Log Types:PRE FORM 5
Log Types:CBL; MUD LOG; GR; MPR-GR
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1217 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 0 ft., Bottom: 1217 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7834 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 735, Top: 930 ft., Bottom: 7834 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6783 ft., Depth: 11972 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7180 ft.
NIOBRARA7375 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2025                  Interval Top: 7873 ft.    Interval Bottom: 11982 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/15/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/29/2012Treatment End Date:9/30/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7873-11982. 1100300# 40/70 SAND, 2226800# 30/50 SAND, 161700# SUPER LC, 3488800# TOTAL. 37375 BBL X-LINKED GEL, 36000 BBL FR WATER, 1204 BBL LINEAR GEL, 74579 BBL TOTAL FLUID.
Total fluid used in treatment (bbls):74579Max pressure during treatment (psi):7095
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):11181
Fresh water used in treatment (bbls):36000Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3488800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7360 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/27/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 462
BTU_GAS 1299
CALC_BBLS_OIL 462
CALC_GOR 1169
CALC_MCF_GAS 540
CASING_PRESS 1611
GRAVITY_OIL 44
MCF_GAS 540
TUBING_PRESS 1187
Perforation Data:
Interval Top:7873 ft.# Of Holes:0
Interval Bottom:11982 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)508
Total Gas Produced (MCF)2019
GOR3974
GOR DeterminationBOE
Average BOE per Day2.315
Average MCFE per Day13.417

 Federal Financial Assurance  i 

 Tribal Well  i No