Wellbore #00 Wellbore Classification: GW Status: AB - 11/13/2023 Measured TD: 7860 ft. Vertical TD: 7756 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/13/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/11/2013 | | Proposed Top PZ Location: | Sec:3 Twp: 3N 65W | Footage: 27 FSL 43 FWL | | Bottom Hole Location: | Sec:3 Twp: 3N 65W | Footage: 23 FSL 48 FWL | | Proposed Depth/Form: | 7407 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 219, Top: 0 ft., Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7834 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 6700 ft., Bottom: 7834 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4785 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 83, Top: 4185 ft., Bottom: 4785 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/22/2013 | | Spud Date: | 5/18/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7860 ft. | Measured PB depth: | 7824 ft. | | True Vertical TD: | 7756 ft. | True Vertical PB depth: | 7720 ft. | | Top PZ Location: | Sec:3 Twp: 3N 65W | Footage: 27 FSL 43 FWL | | Bottom Hole Location: | Sec:3 Twp: 3N 65W | Footage: 23 FSL 48 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 756 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 756 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7849 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 3170 ft., Bottom: 7860 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4431 ft. | | | | | NIOBRARA | 6971 ft. | | | | | CODELL | 7248 ft. | | | | | J SAND | 7707 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 11/13/2023 Interval Top: 7728 ft. Interval Bottom: 7763 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/2/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/18/2013 | Treatment End Date: | 7/18/2013 | | Treatment Summary: | Frac'd the J Sand with 152,520# 30/50 and 160,229 gals SLF. | | Total fluid used in treatment (bbls): | 3815 | Max pressure during treatment (psi): | 5056 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.79 | | Recycled water used in treatment (bbls): | 3815 | Total flowback volume recovered (bbls): | 262 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 152520 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7728 ft. | # Of Holes: | 75 | | Interval Bottom: | 7763 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/13/2013 Interval Top: 7249 ft. Interval Bottom: 7265 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/2/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/18/2013 | Treatment End Date: | 7/18/2013 | | Treatment Summary: | Set CFP @ 7310'. 07-18-13
Frac'd the Codell with 149,580# 30/50 and 141,114 gals SLF. 07-18-13 | | Total fluid used in treatment (bbls): | 3359 | Max pressure during treatment (psi): | 6192 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | 3359 | Total flowback volume recovered (bbls): | 262 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 149580 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7249 ft. | # Of Holes: | 48 | | Interval Bottom: | 7265 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 8/9/2013 Interval Top: 6976 ft. Interval Bottom: 7763 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/2/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/9/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 6870'. 07-22-13
Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 07-23-13
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7673 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/9/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 54 | | BBLS_OIL | 31 | | BTU_GAS | 1260 | | CALC_BBLS_H2O | 54 | | CALC_BBLS_OIL | 31 | | CALC_GOR | 20645 | | CALC_MCF_GAS | 640 | | CASING_PRESS | 1310 | | GRAVITY_OIL | 60 | | MCF_GAS | 640 | | TUBING_PRESS | 905 |
| | Perforation Data: | | Interval Top: | 6976 ft. | # Of Holes: | 227 | | Interval Bottom: | 7763 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/13/2023 Interval Top: 6976 ft. Interval Bottom: 7265 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/2/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6976 ft. | # Of Holes: | 152 | | Interval Bottom: | 7265 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/13/2013 Interval Top: 6976 ft. Interval Bottom: 7045 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/2/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/18/2013 | Treatment End Date: | 7/18/2013 | | Treatment Summary: | Set CFP @ 7100'. 07-18-13
Frac'd the Niobrara with 100,660# 30/50 and 122,764 gals SLF. 07-18-13 | | Total fluid used in treatment (bbls): | 2923 | Max pressure during treatment (psi): | 6150 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | 2923 | Total flowback volume recovered (bbls): | 262 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 100660 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6976 ft. | # Of Holes: | 104 | | Interval Bottom: | 7045 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/13/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|