|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/11/2022 Measured TD: 8465 ft. Vertical TD: 8062 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/11/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/16/2013 | | Proposed Top PZ Location: | Sec:13 Twp: 1N 66W | Footage: 1295 FNL 1296 FEL | | Bottom Hole Location: | Sec:13 Twp: 1N 66W | Footage: 1296 FNL 1294 FEL | | Proposed Depth/Form: | 8432 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 489, Top: 0 ft., Bottom: 1200 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8432 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 832, Top: , Bottom: 8432 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/9/2011 | | Spud Date: | 12/3/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8465 ft. | Measured PB depth: | 8471 ft. | | True Vertical TD: | 8062 ft. | True Vertical PB depth: | 8068 ft. | | Top PZ Location: | Sec:13 Twp: 1N 66W | Footage: 1295 FNL 1296 FEL | | Bottom Hole Location: | Sec:13 Twp: 1N 66W | Footage: 1296 FNL 1294 FEL | | Log Types: | CBL/GRL/CCL, Triple Combo. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 1254 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 473, Top: 0 ft., Bottom: 1254 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 8516 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 2400 ft., Bottom: 8516 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7524 ft. | | | | | FORT HAYS | 7842 ft. | | | | | CODELL | 7857 ft. | | | | | GREENHORN | 7960 ft. | | | | | D SAND | 8245 ft. | | | | | MOWRY | 8285 ft. | | | | | J SAND | 8301 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 11/21/2022 Interval Top: 8303 ft. Interval Bottom: 8340 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/27/2012 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/10/2012 | | Treatment Summary: | Frac'd the J-Sand w/ 152127 gals of Silverstim and Slick Water with 280,600#'s of Ottawa sand.
The J-Sand is producing through a composite flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 81 | | BBLS_OIL | 67 | | BTU_GAS | 1328 | | CALC_BBLS_H2O | 81 | | CALC_BBLS_OIL | 67 | | CALC_GOR | 970 | | CALC_MCF_GAS | 65 | | CASING_PRESS | 500 | | GRAVITY_OIL | 47 | | MCF_GAS | 25 |
| | Perforation Data: | | Interval Top: | 8303 ft. | # Of Holes: | 88 | | Interval Bottom: | 8340 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/5/2012 Interval Top: 7859 ft. Interval Bottom: 7871 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/27/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/10/2012 | | Treatment Summary: | Frac'd the Codell w/ 118677 gals of Silverstim and Slick Water 15% HCI with 245,000#'s of Ottawa sand.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7859 ft. | # Of Holes: | 48 | | Interval Bottom: | 7871 ft. | Hole Size: | 0.44 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/21/2022 Interval Top: 7650 ft. Interval Bottom: 7871 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/27/2012 | Choke Size: | 0.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/10/2012 | | Treatment Summary: | Frac'd Niobrara-Codell w/ 273199 gals of Silverstim and Slick Water,15% HCI with 495,040#'s of Ottawa sand.
The Codell is producing through a composite flow through plug.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 81 | | BBLS_OIL | 67 | | BTU_GAS | 1328 | | CALC_BBLS_H2O | 81 | | CALC_BBLS_OIL | 67 | | CALC_GOR | 970 | | CALC_MCF_GAS | 65 | | CASING_PRESS | 500 | | GRAVITY_OIL | 47 | | MCF_GAS | 65 |
| | Perforation Data: | | Interval Top: | 7650 ft. | # Of Holes: | 96 | | Interval Bottom: | 7871 ft. | Hole Size: | 0 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 1/31/2012 Interval Top: 7638 ft. Interval Bottom: 8340 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/27/2012 | Choke Size: | 0.000 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 81 | | BBLS_OIL | 67 | | BTU_GAS | 1328 | | CALC_BBLS_H2O | 81 | | CALC_BBLS_OIL | 67 | | CALC_GOR | 970 | | CALC_MCF_GAS | 65 | | CASING_PRESS | 500 | | GRAVITY_OIL | 47 | | MCF_GAS | 65 |
| | Perforation Data: | | Interval Top: | 7638 ft. | # Of Holes: | 184 | | Interval Bottom: | 8340 ft. | Hole Size: | 0 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/5/2012 Interval Top: 7638 ft. Interval Bottom: 7728 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/27/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/10/2012 | | Treatment Summary: | Frac'd the Niobrara w/ 154522 gals of Silverstim and Slick Water with 250,040#'s of Ottawa sand.
Commingle the Niobrara and Codell.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7638 ft. | # Of Holes: | 48 | | Interval Bottom: | 7728 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/21/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|