|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 11/1/2020 Measured TD: 8388 ft. Vertical TD: 8146 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 11/1/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/16/2013 | Proposed Top PZ Location: | Sec:11 Twp: 1N 66W | Footage: 1982 FNL 702 FEL | Bottom Hole Location: | Sec:11 Twp: 1N 66W | Footage: 1980 FNL 704 FEL | Proposed Depth/Form: | 8344 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2NE/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2NE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 489, Top: 0 ft., Bottom: 1200 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8344 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 819, Top: , Bottom: 8344 ft. |
| | |
Wellbore Completed | Completion Date: | 9/21/2011 | Spud Date: | 9/16/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8388 ft. | Measured PB depth: | 8333 ft. | True Vertical TD: | 8146 ft. | True Vertical PB depth: | 8091 ft. | Top PZ Location: | Sec:11 Twp: 1N 66W | Footage: 1982 FNL 702 FEL | Bottom Hole Location: | Sec:11 Twp: 1N 66W | Footage: 1980 N 704 E | Log Types: | CBL/GRL/CCL, ACL/TRL/SDL/DSNL, CSL,NGRL. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1256 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 474, Top: 0 ft., Bottom: 1256 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8379 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 725, Top: 1658 ft., Bottom: 8379 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7434 ft. | | | | FORT HAYS | 7727 ft. | | | | CODELL | 7749 ft. | | | | MOWRY | 8193 ft. | | | | J SAND | 8211 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 11/1/2020 Interval Top: 8218 ft. Interval Bottom: 8243 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/25/2011 | Choke Size: | 0.000 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/18/2011 | Treatment Summary: | Frac'd the J-Sand w/ 149762 gals of Silverstim and Slick Water with 279,794#'s of Ottawa sand.
The J-Sand is producing through a Composite Flow Through Plug. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/28/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 18 | BTU_GAS | 1138 | CALC_BBLS_H2O | 15 | CALC_BBLS_OIL | 18 | CALC_GOR | 1722 | CALC_MCF_GAS | 31 | CASING_PRESS | 700 | GRAVITY_OIL | 47 | MCF_GAS | 31 |
| Perforation Data: | Interval Top: | 8218 ft. | # Of Holes: | 48 | Interval Bottom: | 8243 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 11/1/2020 Interval Top: 7553 ft. Interval Bottom: 7764 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/25/2011 | Choke Size: | 0.000 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/18/2011 | Treatment Summary: | Frac'd the Niobrara-Codell w/ 279,080 gals of Silverstim and Slick Water with 494,250#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/28/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 18 | BTU_GAS | 1138 | CALC_BBLS_H2O | 15 | CALC_BBLS_OIL | 18 | CALC_GOR | 1722 | CALC_MCF_GAS | 31 | CASING_PRESS | 700 | GRAVITY_OIL | 47 | MCF_GAS | 31 |
| Perforation Data: | Interval Top: | 7553 ft. | # Of Holes: | 72 | Interval Bottom: | 7764 ft. | Hole Size: | 0 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 10/31/2020 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|