Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34165
Well Classification: OW Status: SI - 11/1/2020
Well Name/No:CROISSANT USX WW #11-17D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2020
FacilityID:424750LocationID:305157
County:WELD #123Location:NENE 11 1N66W 6
Field:WATTENBERG - #90750Elevation:5076 ft.
Planned Location:547FNL  469 FELLat/Long: 40.071650 / -104.736530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.071660 / -104.736550Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/21/2011
End Date: 10/21/2011
Reported: 11/4/2011
Prior to rule 205A.b.(2)(A)
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 11/1/2020             Measured TD: 8363 ft.    Vertical TD: 8171 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 11/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/16/2013
Proposed Top PZ Location:Sec:11 Twp: 1N 66W Footage: 1363 FNL  1392 FEL
Bottom Hole Location:Sec:11 Twp: 1N 66W Footage: 1364 FNL  1399 FEL
Proposed Depth/Form:8313 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 489, Top: 0 ft., Bottom: 1200 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8313 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 814, Top: , Bottom: 8313 ft.

Wellbore Completed
Completion Date:9/14/2011
Spud Date:9/10/2011Spud Date Is:ACTUAL
Measured TD:8363 ft.Measured PB depth:8308 ft.
True Vertical TD:8171 ft.True Vertical PB depth:8116 ft.
Top PZ Location:Sec:11 Twp: 1N 66WFootage: 1363 FNL  1392 FEL
Bottom Hole Location:Sec:11 Twp: 1N 66WFootage: 1364 N  1399 E
Log Types:CBL/GR/CCL, CLD/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1254 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 473, Top: 0 ft., Bottom: 1254 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8353 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 2500 ft., Bottom: 8353 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7413 ft.
FORT HAYS7696 ft.
CODELL7716 ft.
J SAND7996 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 11/1/2020                 Interval Top: 8192 ft.    Interval Bottom: 8214 ft.

 Completed Information for Formation J SAND
1st Production Date:10/25/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:10/10/2011
Treatment Summary:Pumped 268,763 lbs of Ottawa Proppant, 13,784 lbs of SB Excel Proppant and 146,618 gallons of Slick Water and Silverstim.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8192 ft.# Of Holes:72
Interval Bottom:8214 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/23/2012                 Interval Top: 7720 ft.    Interval Bottom: 7734 ft.

 Completed Information for Formation CODELL
1st Production Date:10/25/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:10/18/2011
Treatment Summary:Pumped 248,230 lbs of Preferred Rock Proppant and 117,266 gallons of 15% HCL, Slick Water, and Silverstim. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7720 ft.# Of Holes:56
Interval Bottom:7734 ft.Hole Size:0.44 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/28/2011                Interval Top: 7519 ft.    Interval Bottom: 8214 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/25/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Tubing Size:2.375 in.Tubing Setting Depth:8167 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2011Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 18
BTU_GAS 1139
CALC_BBLS_H2O 15
CALC_BBLS_OIL 18
CALC_GOR 1722
CALC_MCF_GAS 31
CASING_PRESS 725
GRAVITY_OIL 44
MCF_GAS 31
Perforation Data:
Interval Top:7519 ft.# Of Holes:176
Interval Bottom:8214 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 5/1/2017                  Interval Top: 7519 ft.    Interval Bottom: 7734 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/25/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7519 ft.# Of Holes:104
Interval Bottom:7734 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/23/2012                 Interval Top: 7519 ft.    Interval Bottom: 7610 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/25/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:10/21/2011
Treatment Summary:Pumped 247,497 lbs of Ottawa Proppant and 155,031 gallons of Slick Water and Silverstim. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7519 ft.# Of Holes:48
Interval Bottom:7610 ft.Hole Size:0.69 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
10/31/2020
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No