|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/1/2025 Measured TD: 8067 ft. Vertical TD: 7790 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/15/2013 | | Proposed Top PZ Location: | Sec:30 Twp: 2N 67W | Footage: 2130 FNL 2130 FEL | | Bottom Hole Location: | Sec:30 Twp: 2N 67W | Footage: 2130 FNL 2130 FEL | | Proposed Depth/Form: | 8122 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24.0 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8515 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8515 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/31/2012 | | Spud Date: | 5/26/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8067 ft. | Measured PB depth: | 8010 ft. | | True Vertical TD: | 7790 ft. | True Vertical PB depth: | 7733 ft. | | Top PZ Location: | Sec:30 Twp: 2N 67W | Footage: 1784 FNL 2124 FEL | | Bottom Hole Location: | Sec:30 Twp: 2N 67W | Footage: 1800 FNL 2133 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; NO OPEN HOLE LOGS | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 886 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 886 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8056 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1018, Top: 444 ft., Bottom: 8056 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4200 ft. | | | | | SHANNON | 4225 ft. | | | | | SUSSEX | 4504 ft. | | | | | NIOBRARA | 7585 ft. | | | | | CODELL | 7856 ft. | | | | | FORT HAYS | 7856 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 4/2/2025 Interval Top: 7856 ft. Interval Bottom: 7876 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/19/2012 | Treatment End Date: | 7/19/2012 | | Treatment Summary: | PERF CODL 7856-7876 HOLES 60 SIZE .38
Frac CODL down 4.5" casing w/ 207,858 gal slickwater w/ 151,680# 40/70, 4,000# 20/40.
Broke @ 1,953 psi @ 1.5 bpm. ATP=4,018 psi; MTP=4,792 psi; ATR=59.7 bpm; ISDP=2,666 psi | | Total fluid used in treatment (bbls): | 3611 | Max pressure during treatment (psi): | 4792 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 155680 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7856 ft. | # Of Holes: | 60 | | Interval Bottom: | 7876 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/2/2025 Interval Top: 7648 ft. Interval Bottom: 7876 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/1/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 50 | | BTU_GAS | 1169 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 2803 | | CALC_MCF_GAS | 140 | | CASING_PRESS | 1688 | | GRAVITY_OIL | 48 | | MCF_GAS | 140 |
| | Perforation Data: | | Interval Top: | 7648 ft. | # Of Holes: | 112 | | Interval Bottom: | 7876 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 4/2/2025 Interval Top: 7648 ft. Interval Bottom: 7769 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/4/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/19/2012 | Treatment End Date: | 7/19/2012 | | Treatment Summary: | PERF NBRR 7648-7769 HOLES 52 SIZE .42
Frac NBRR down 4.5" casing w/ 252 gal 15% HCl & 249,816 gal slickwater w/ 200,340# 40/70, 4,000# 20/40.
Broke @ 2,955 psi @ 7.5 bpm. ATP=4,741 psi; MTP=5,397 psi; ATR=59.0 bpm; ISDP=2,883 psi | | Total fluid used in treatment (bbls): | 5948 | Max pressure during treatment (psi): | 5397 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 5 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204340 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7648 ft. | # Of Holes: | 52 | | Interval Bottom: | 7769 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/01/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 55 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.024 |
| Average MCFE per Day | 0.148 |
| Federal Financial Assurance | i | |
|
|