Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34139
Well Classification: OW Status: PA - 7/2/2020
Well Name/No:392 VENTURES #22ND
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:HIGHPOINT ENERGY LLC - 10544
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/2/2020
FacilityID:424705LocationID:424350
Municipality/County:WINDSOR / WELD #123Location:SENW 22 6N67W 6
Field:WATTENBERG - #90750Elevation:4783 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1532FNL  2375 FWLLat/Long: 40.475472 / -104.880539Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.475485 / -104.880540Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/14/2014
End Date: 6/14/2014
Reported: 7/15/2014
Days to report: 31
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 9/17/2019             Measured TD: 7425 ft.    Vertical TD: 7396 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 9/17/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/13/2013
Proposed Top PZ Location:Sec:22 Twp: 6N 67W Footage: 1330 FNL  2641 FEL
Bottom Hole Location:Sec:22 Twp: 6N 67W Footage: 1350 FNL  2664 FEL
Proposed Depth/Form:7792 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 400 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 400 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7792 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 265, Top: 6640 ft., Bottom: 7792 ft.

Wellbore Completed
Completion Date:12/12/2011
Spud Date:12/6/2011Spud Date Is:ACTUAL
Measured TD:7425 ft.Measured PB depth:7390 ft.
True Vertical TD:7396 ft.True Vertical PB depth:7361 ft.
Top PZ Location:Sec:22 Twp: 6N 67WFootage: 1330 FNL  2641 FEL
Bottom Hole Location:Sec:22 Twp: 6N 67WFootage: 1350 FNL  2664 FEL
Log Types:Density, Neutron, Induction, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 456 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 245, Top: 0 ft., Bottom: 456 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7406 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 1708 ft., Bottom: 7406 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6942 ft.NN
CODELL7178 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/8/2016                  Interval Top: 7182 ft.    Interval Bottom: 7194 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/1/2012
Treatment Summary:159,798 gal slickwater with 30/50 sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 47
BTU_GAS 1283
CALC_BBLS_OIL 47
CALC_GOR 107
CALC_MCF_GAS 5
CASING_PRESS 1300
GRAVITY_OIL 43
MCF_GAS 5
Perforation Data:
Interval Top:7182 ft.# Of Holes:48
Interval Bottom:7194 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/2/2020                  Interval Top: 6948 ft.    Interval Bottom: 7194 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/21/2014Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:6930 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/14/2014Test Method:flowing
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1320
CALC_BBLS_OIL 1
CALC_GOR 3700
CALC_MCF_GAS 4
CASING_PRESS 550
GRAVITY_OIL 44
MCF_GAS 4
TUBING_PRESS 500
Perforation Data:
Interval Top:6948 ft.# Of Holes:120
Interval Bottom:7194 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/21/2014                 Interval Top: 6948 ft.    Interval Bottom: 7004 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/21/2014Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/14/2014Treatment End Date:6/14/2014
Treatment Summary:Frac Niobrara A & B w/ 3451 bbls clean water, 24 BBL (7-1/2% HCL) & 248,560 lbs 30/50 sand
Total fluid used in treatment (bbls):3475Max pressure during treatment (psi):5666
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):480
Fresh water used in treatment (bbls):3451Disposition method For flowback:DISPOSAL
Total proppant used (lbs):248560Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/21/2014Test Method:flowing
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 74
CALC_BBLS_OIL 74
CASING_PRESS 800
GRAVITY_OIL 44
Perforation Data:
Interval Top:6948 ft.# Of Holes:72
Interval Bottom:7004 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/02/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No