|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/7/2018 Measured TD: 8282 ft. Vertical TD: 8092 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/7/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 7/27/2013 | Proposed Top PZ Location: | Sec:1 Twp: 1N 67W | Footage: 507 FSL 2102 FEL | Bottom Hole Location: | Sec:1 Twp: 1N 67W | Footage: 507 FSL 2095 FEL | Proposed Depth/Form: | 8295 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE/4 | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 250 , Unit Acreage: 80, Drill Unit: S/2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8295 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8295 ft. |
| | |
Wellbore Completed | Completion Date: | 11/26/2011 | Spud Date: | 11/22/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8282 ft. | Measured PB depth: | 8249 ft. | True Vertical TD: | 8092 ft. | True Vertical PB depth: | 8059 ft. | Top PZ Location: | Sec:1 Twp: 1N 67W | Footage: 507 FSL 2102 FEL | Bottom Hole Location: | Sec:1 Twp: 1N 67W | Footage: 507 FSL 2095 FEL | Log Types: | PRE FORM 5 | Log Types: | CBL
NO OPEN HOLE LOGS, BRIDGED OUT TWICE @ 1048 AND 1173'. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 883 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 0 ft., Bottom: 883 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8273 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 50, Top: 8026 ft., Bottom: 8273 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8008 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1015, Top: 756 ft., Bottom: 8014 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 746 ft., Depth: 8008 ft., Bottom: 8008 ft., Sacks: 1015, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4289 ft. | | | | SUSSEX | 4747 ft. | | | | SHANNON | 5245 ft. | | | | NIOBRARA | 7359 ft. | | | | CODELL | 7665 ft. | | | | J SAND | 8121 ft. | | | |
Formation CODL Formation Classification: Status: CM - 3/13/2012 Interval Top: 7667 ft. Interval Bottom: 7685 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/2/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/24/2012 | Treatment Summary: | CD PERF 7667-7685 HOLES 54 SIZE 0.38
Frac CODL down casing w/ 214,284 gal slickwater w/ 152,980# 40/70, 4,000# 20/40 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7667 ft. | # Of Holes: | 54 | Interval Bottom: | 7685 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/7/2018 Interval Top: 7435 ft. Interval Bottom: 7685 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/2/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/24/2012 | Treatment Summary: | NB PERF 7435-7531 HOLES 72 SIZE 0.42 CD PERF 7667-7685 HOLES 54 SIZE 0.38
Frac NBRR down casing w/ 250 gal 15% HCl & 235,830 gal slickwater w/ 202,100# 40/70, 4,000# 20/40
Frac CODL down casing w/ 214,284 gal slickwater w/ 152,980# 40/70, 4,000# 20/40 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/3/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 50 | BTU_GAS | 1161 | CALC_BBLS_OIL | 50 | CALC_GOR | 2000 | CALC_MCF_GAS | 100 | GRAVITY_OIL | 47 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7435 ft. | # Of Holes: | 126 | Interval Bottom: | 7685 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 3/13/2012 Interval Top: 7435 ft. Interval Bottom: 7531 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/2/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/24/2012 | Treatment Summary: | NB PERF 7435-7531 HOLES 72 SIZE 0.42
Frac NBRR down casing w/ 250 gal 15% HCl & 235,830 gal slickwater w/ 202,100# 40/70, 4,000# 20/40 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7435 ft. | # Of Holes: | 72 | Interval Bottom: | 7531 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 05/07/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|