Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34066
Well Classification: OW Status: PA - 8/6/2025
Well Name/No:VISTA USX #WW33-17D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/6/2025
FacilityID:424492LocationID:332438
County:WELD #123Location:NWNE 33 1N66W 6
Field:WATTENBERG - #90750Elevation:5071 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:721FNL  2032 FELLat/Long: 40.012980 / -104.779950Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.012977 / -104.779945Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/12/2011
End Date: 11/12/2011
Reported: 11/14/2011
Prior to rule 205A.b.(2)(A)
Days to report: 2
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 8/6/2025             Measured TD: 8398 ft.    Vertical TD: 8286 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 8/6/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/27/2013
Proposed Top PZ Location:Sec:33 Twp: 1N 66W Footage: 1247 FNL  1265 FEL
Bottom Hole Location:Sec:33 Twp: 1N 66W Footage: 1247 FNL  1265 FEL
Proposed Depth/Form:8361 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1360 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 560, Top: 0 ft., Bottom: 1360 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8361 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 822, Top: , Bottom: 8361 ft.

Wellbore Completed
Completion Date:10/4/2011
Spud Date:9/30/2011Spud Date Is:ACTUAL
Measured TD:8398 ft.Measured PB depth:8342 ft.
True Vertical TD:8286 ft.True Vertical PB depth:8230 ft.
Top PZ Location:Sec:33 Twp: 1N 66WFootage: 1265 FNL  1242 FEL
Bottom Hole Location:Sec:33 Twp: 1N 66WFootage: 1265 FNL  1242 FEL
Log Types:CBL/GR/CCL, SD/DSN/AC/TR, CS/NG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1426 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 538, Top: 0 ft., Bottom: 1426 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8367 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 725, Top: 1426 ft., Bottom: 8367 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4422 ft.
SUSSEX4903 ft.
SHANNON5557 ft.
NIOBRARA7420 ft.
FORT HAYS7766 ft.
CODELL7789 ft.
MOWRY8087 ft.
J SAND8100 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 8/6/2025                  Interval Top: 8226 ft.    Interval Bottom: 8251 ft.

 Completed Information for Formation J SAND
1st Production Date:11/15/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2011
Treatment Summary:Pumped 272,355 lbs of Ottawa Proppant, 12,745 lbs of SB Excel Proppant and 155,863 gallons of Slick Water and Silverstim. The J-Sand is producing through a composite flow through plug.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8226 ft.# Of Holes:76
Interval Bottom:8251 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/31/2012                Interval Top: 7791 ft.    Interval Bottom: 7802 ft.

 Completed Information for Formation CODELL
1st Production Date:11/15/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/11/2011
Treatment Summary:Pumped 245,771 lbs of Ottawa Proppant and 116,839 gallons of 15% HCL, Slick Water, and Silverstim. The Codell is producing through a composite flow through plug. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7791 ft.# Of Holes:44
Interval Bottom:7802 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 11/18/2011                Interval Top: 7429 ft.    Interval Bottom: 8251 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:11/15/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:8211 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/18/2011Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 19
BTU_GAS 1333
CALC_BBLS_H2O 21
CALC_BBLS_OIL 19
CALC_GOR 158
CALC_MCF_GAS 3
CASING_PRESS 220
GRAVITY_OIL 51
MCF_GAS 3
Perforation Data:
Interval Top:7429 ft.# Of Holes:200
Interval Bottom:8251 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/6/2025                  Interval Top: 7429 ft.    Interval Bottom: 7802 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/15/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7429 ft.# Of Holes:124
Interval Bottom:7802 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/31/2012                Interval Top: 7429 ft.    Interval Bottom: 7643 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/15/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/11/2011
Treatment Summary:Pumped 147,628 lbs of Ottawa Proppant and 97,500 gallons of Slick Water and Silverstim. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7429 ft.# Of Holes:80
Interval Bottom:7643 ft.Hole Size:0.72 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/06/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No