|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/6/2025 Measured TD: 8589 ft. Vertical TD: 8279 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/6/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/27/2013 | | Proposed Top PZ Location: | Sec:33 Twp: 1N 66W | Footage: 1950 FNL 1990 FWL | | Bottom Hole Location: | Sec:33 Twp: 1N 66W | Footage: 1950 FNL 1990 FWL | | Proposed Depth/Form: | 8557 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2NW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1360 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 1360 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8557 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 851, Top: , Bottom: 8557 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/18/2011 | | Spud Date: | 9/13/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8589 ft. | Measured PB depth: | 8419 ft. | | True Vertical TD: | 8279 ft. | True Vertical PB depth: | 8109 ft. | | Top PZ Location: | Sec:33 Twp: 1N 66W | Footage: 1935 FNL 1993 FWL | | Bottom Hole Location: | Sec:33 Twp: 1N 66W | Footage: 1935 FNL 1993 FWL | | Log Types: | CBL/GR/CCL, HRI, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1453 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 548, Top: 0 ft., Bottom: 1453 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8580 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 220 ft., Bottom: 8580 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7560 ft. | | | | | FORT HAYS | 7962 ft. | | | | | CODELL | 7985 ft. | | | | | J SAND | 8409 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 8/6/2025 Interval Top: 8415 ft. Interval Bottom: 8440 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/16/2011 | Choke Size: | 10.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/14/2011 | | Treatment Summary: | Frac'd J-Sand w/ 148,890 gals of Slick Water and Silverstim with 280,600#'s of Ottawa sand.
J-Sand producing through composite flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/2/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1332 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 625 | | CALC_MCF_GAS | 5 | | CASING_PRESS | 680 | | GRAVITY_OIL | 45 | | MCF_GAS | 5 |
| | Perforation Data: | | Interval Top: | 8415 ft. | # Of Holes: | 72 | | Interval Bottom: | 8440 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/6/2025 Interval Top: 7564 ft. Interval Bottom: 7992 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/16/2011 | Choke Size: | 10.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/14/2011 | | Treatment Summary: | Niobrara perfs 7564-7838 (80 holes) Codell perfs 7982-7992 (40 holes),
Frac'd Niobrara and Codell with 389,361 gals of Slick Water, silverstim and 15% HCI with 639,680#'s of Ottawa sand
Commingle Codell and Niobrara.
Codell and Niobrara producing through compoaite flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/2/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1332 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 625 | | CALC_MCF_GAS | 5 | | CASING_PRESS | 680 | | GRAVITY_OIL | 45 | | MCF_GAS | 5 |
| | Perforation Data: | | Interval Top: | 7564 ft. | # Of Holes: | 120 | | Interval Bottom: | 7992 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/06/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|