|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/18/2019 Measured TD: 7510 ft. Vertical TD: 7395 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/18/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/19/2013 | | Proposed Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 624 FNL 1901 FEL | | Bottom Hole Location: | Sec:22 Twp: 6N 67W | Footage: 637 FNL 1878 FEL | | Proposed Depth/Form: | 7851 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: N/2NW | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NW |
| | |
| Wellbore Completed | | Completion Date: | 12/27/2011 | | Spud Date: | 12/21/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7510 ft. | Measured PB depth: | 7485 ft. | | True Vertical TD: | 7395 ft. | True Vertical PB depth: | 7370 ft. | | Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 624 FNL 1901 FEL | | Bottom Hole Location: | Sec:22 Twp: 6N 67W | Footage: 637 FNL 1878 FEL | | Log Types: | Density, Neutron, Induction, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 458 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 200 ft., Bottom: 458 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7501 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 815, Top: 1465 ft., Bottom: 7501 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: , Bottom: 200 ft., Sacks: 200, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6991 ft. | | N | N | | CODELL | 7320 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/8/2016 Interval Top: 7324 ft. Interval Bottom: 7336 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/2/2012 | | Treatment Summary: | 212,982 gal slickwater containing 150,660# 30/50 sand
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1292 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 1087 | | CALC_MCF_GAS | 9 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 45 | | MCF_GAS | 9 |
| | Perforation Data: | | Interval Top: | 7324 ft. | # Of Holes: | 48 | | Interval Bottom: | 7336 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/18/2019 Interval Top: 7132 ft. Interval Bottom: 7336 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/21/2016 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/12/2014 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 22 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 22 | | CASING_PRESS | 750 | | GRAVITY_OIL | 44 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7132 ft. | # Of Holes: | 120 | | Interval Bottom: | 7336 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 6/21/2014 Interval Top: 7132 ft. Interval Bottom: 7214 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/21/2016 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/12/2014 | Treatment End Date: | 6/12/2014 | | Treatment Summary: | Frac Niobrara B & C w/ 3479 bbls clean water, 24 BBL (7-1/2% HCL) & 251120 lbs 30/50 sand | | Total fluid used in treatment (bbls): | 3503 | Max pressure during treatment (psi): | 5380 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 3479 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 251120 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/21/2014 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 77 | | CALC_BBLS_OIL | 77 | | CASING_PRESS | 450 | | GRAVITY_OIL | 44 |
| | Perforation Data: | | Interval Top: | 7132 ft. | # Of Holes: | 72 | | Interval Bottom: | 7214 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/18/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|