|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/23/2019 Measured TD: 7930 ft. Vertical TD: 7789 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/23/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/18/2013 | | Proposed Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 2608 FNL 1320 FWL | | Bottom Hole Location: | Sec:25 Twp: 2N 65W | Footage: 2608 FNL 1320 FWL | | Proposed Depth/Form: | 7881 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 940 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 940 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7881 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 751, Top: , Bottom: 7881 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/21/2011 | | Spud Date: | 10/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7930 ft. | Measured PB depth: | 7875 ft. | | True Vertical TD: | 7789 ft. | True Vertical PB depth: | 7734 ft. | | Top PZ Location: | Sec:25 Twp: 2N 65W | Footage: 2608 FNL 1327 FWL | | Bottom Hole Location: | Sec:25 Twp: 2N 65W | Footage: 2608 FNL 1329 FWL | | Log Types: | CBL, Compensated Density/Neutron, Dual Induction | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 960 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 379, Top: 0 ft., Bottom: 960 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7919 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 595, Top: 2350 ft., Bottom: 7919 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6995 ft. | | | | | FORT HAYS | 7272 ft. | | | | | CODELL | 7295 ft. | | | | | MOWRY | 7734 ft. | | | | | J SAND | 7748 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 7/23/2019 Interval Top: 7759 ft. Interval Bottom: 7791 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/16/2011 | | Treatment Summary: | 279809 lbs Ottawa proppant, 13200 lbs SB Excel proppant, 147807 gals silverstim |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7759 ft. | # Of Holes: | 80 | | Interval Bottom: | 7791 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: Status: CM - 8/7/2012 Interval Top: 7297 ft. Interval Bottom: 7309 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/16/2011 | | Treatment Summary: | 260010 lbs Ottawa sand, 117172 gals 15% HCl/Silverstim |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7297 ft. | # Of Holes: | 48 | | Interval Bottom: | 7309 ft. | Hole Size: | 0.71 in. |
|
Formation JNBCD Formation Classification: Status: CM - 7/23/2019 Interval Top: 7071 ft. Interval Bottom: 7791 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/9/2011 | | Treatment Summary: | 419696 gals silverstim; 598780 lbs Ottawa sand proppant; 13200 lbs SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/27/2012 | Test Method: | Flowing | | Hours Tested: | 8 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 2 | | BTU_GAS | 1286 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 3000 | | CALC_MCF_GAS | 6 | | CASING_PRESS | 220 | | GRAVITY_OIL | 46 | | MCF_GAS | 6 |
| | Perforation Data: | | Interval Top: | 7071 ft. | # Of Holes: | 156 | | Interval Bottom: | 7791 ft. | Hole Size: | 0 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/23/2019 Interval Top: 7071 ft. Interval Bottom: 7309 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7071 ft. | # Of Holes: | 96 | | Interval Bottom: | 7309 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 8/7/2012 Interval Top: 7071 ft. Interval Bottom: 7167 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/16/2011 | | Treatment Summary: | 258961 lbs Ottawa proppant, 154716 gals slickwater/silverstim |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7071 ft. | # Of Holes: | 48 | | Interval Bottom: | 7167 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/23/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|