Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33989
Well Classification: OW Status: PA - 7/24/2019
Well Name/No:SHAKLEE USX #X25-06
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/24/2019
FacilityID:424336LocationID:424330
Municipality/County:HUDSON / WELD #123Location:SENW 25 2N65W 6
Field:WATTENBERG - #90750Elevation:4904 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1837FNL  2039 FWLLat/Long: 40.111700 / -104.614420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.111700 / -104.614430Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/17/2012
End Date: 1/17/2012
Reported: 1/18/2012
Prior to rule 205A.b.(2)(A)
Days to report: 1
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/24/2019             Measured TD: 7360 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/24/2019
Wellbore PermitDRIFTED
Permit #: Expiration Date:7/18/2013
Proposed Depth/Form:7388 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NW4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 940 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 325, Top: 0 ft., Bottom: 940 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7388 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 679, Top: , Bottom: 7388 ft.

Wellbore Completed
Completion Date:11/3/2011
Spud Date:10/29/2011Spud Date Is:ACTUAL
Measured TD:7360 ft.Measured PB depth:7305 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL/GRL/CCL. NO OPEN HOLE LOGS WERE RUN.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 1022 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 386, Top: 0 ft., Bottom: 1022 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7350 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 300 ft., Bottom: 7350 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4540 ft.
SHANNON5130 ft.
NIOBRARA6833 ft.
FORT HAYS7147 ft.
CODELL7171 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/4/2012                  Interval Top: 7172 ft.    Interval Bottom: 7184 ft.

 Completed Information for Formation CODELL
1st Production Date:1/19/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/17/2012
Treatment Summary:Pumped 265,977# preferred rock and 129,719 gals of 15% HCL and slick/gelled water. Codel is producing through a composite flow-through plug.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7172 ft.# Of Holes:48
Interval Bottom:7184 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/24/2019                 Interval Top: 6938 ft.    Interval Bottom: 7184 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/19/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/17/2012
Treatment Summary:CODELL-PUMPED 265,977# PREFERRED ROCK AND 129,719 GALS OF 15% HCL AND SLICK/GELLED H2O. NIOBRARA-PUMPED 264,280# OTTAWA 30/50 SAND AND 163,931 GALS OF FRESH/SLICK/GELLED H2O. CODELL IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2012Test Method:FLOWING
Hours Tested:8Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 16
BTU_GAS 1257
CALC_BBLS_H2O 8
CALC_BBLS_OIL 16
CALC_GOR 3250
CALC_MCF_GAS 52
CASING_PRESS 600
GRAVITY_OIL 48
MCF_GAS 52
Perforation Data:
Interval Top:6938 ft.# Of Holes:96
Interval Bottom:7184 ft.Hole Size:0.72 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/4/2012                  Interval Top: 6938 ft.    Interval Bottom: 7045 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/19/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/17/2012
Treatment Summary:Pumped 264,280# Ottawa 30/50 Sand and 163, 931 gals of fresh/slick/gelled water.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6938 ft.# Of Holes:48
Interval Bottom:7045 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/24/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No