|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/24/2019 Measured TD: 7360 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/24/2019 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 7/18/2013 | | Proposed Depth/Form: | 7388 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NW4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 940 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 940 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7388 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 679, Top: , Bottom: 7388 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/3/2011 | | Spud Date: | 10/29/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7360 ft. | Measured PB depth: | 7305 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL/GRL/CCL.
NO OPEN HOLE LOGS WERE RUN. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 1022 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 386, Top: 0 ft., Bottom: 1022 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7350 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 300 ft., Bottom: 7350 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4540 ft. | | | | | SHANNON | 5130 ft. | | | | | NIOBRARA | 6833 ft. | | | | | FORT HAYS | 7147 ft. | | | | | CODELL | 7171 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 9/4/2012 Interval Top: 7172 ft. Interval Bottom: 7184 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/17/2012 | | Treatment Summary: | Pumped 265,977# preferred rock and 129,719 gals of 15% HCL and slick/gelled water.
Codel is producing through a composite flow-through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 48 | | Interval Bottom: | 7184 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/24/2019 Interval Top: 6938 ft. Interval Bottom: 7184 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/17/2012 | | Treatment Summary: | CODELL-PUMPED 265,977# PREFERRED ROCK AND 129,719 GALS OF 15% HCL AND SLICK/GELLED H2O.
NIOBRARA-PUMPED 264,280# OTTAWA 30/50 SAND AND 163,931 GALS OF FRESH/SLICK/GELLED H2O.
CODELL IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/27/2012 | Test Method: | FLOWING | | Hours Tested: | 8 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 16 | | BTU_GAS | 1257 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 3250 | | CALC_MCF_GAS | 52 | | CASING_PRESS | 600 | | GRAVITY_OIL | 48 | | MCF_GAS | 52 |
| | Perforation Data: | | Interval Top: | 6938 ft. | # Of Holes: | 96 | | Interval Bottom: | 7184 ft. | Hole Size: | 0.72 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/4/2012 Interval Top: 6938 ft. Interval Bottom: 7045 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/17/2012 | | Treatment Summary: | Pumped 264,280# Ottawa 30/50 Sand and 163, 931 gals of fresh/slick/gelled water. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6938 ft. | # Of Holes: | 48 | | Interval Bottom: | 7045 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/24/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|