|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/1/2024 Measured TD: 8077 ft. Vertical TD: 7964 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 7/4/2013 | Proposed Top PZ Location: | Sec:9 Twp: 2N 68W | Footage: 706 FSL 1986 FWL | Bottom Hole Location: | Sec:9 Twp: 2N 68W | Footage: 714 FSL 1985 FWL | Proposed Depth/Form: | 8054 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 273, Top: , Bottom: 750 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8054 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 162, Top: 7043 ft., Bottom: 8054 ft. |
| | |
Wellbore Completed | Completion Date: | 7/6/2013 | Spud Date: | 6/19/2013 | Spud Date Is: | ACTUAL | Measured TD: | 8077 ft. | Measured PB depth: | 8012 ft. | True Vertical TD: | 7964 ft. | True Vertical PB depth: | 7899 ft. | Top PZ Location: | Sec:9 Twp: 2N 68W | Footage: 706 FSL 1986 FWL | Bottom Hole Location: | Sec:9 Twp: 2N 68W | Footage: 714 S 1985 W | Log Types: | CBL/Triple Combo
| Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 40 ft., Weight: 62 , Citings Type: ACTUAL | Cement: | Sacks: 190, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 797 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 320, Top: 0 ft., Bottom: 807 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8067 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 675, Top: 2890 ft., Bottom: 8077 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4196 ft. | | | | NIOBRARA | 7219 ft. | | | | CODELL | 7495 ft. | | | | J SAND | 7935 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/1/2024 Interval Top: 7936 ft. Interval Bottom: 7970 ft. Completed Information for Formation J SAND | 1st Production Date: | 6/17/2014 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/27/2013 | Treatment End Date: | 8/27/2013 | Treatment Summary: | Stage 1 treated with 4298 bbls of slickwater and 158800 lbs of 30/50 proppant. | Total fluid used in treatment (bbls): | 4298 | Max pressure during treatment (psi): | 6500 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.72 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | 158800 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7936 ft. | # Of Holes: | 75 | Interval Bottom: | 7970 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/21/2017 Interval Top: 7496 ft. Interval Bottom: 7517 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/17/2014 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/27/2013 | Treatment End Date: | 8/27/2013 | Treatment Summary: | Stage 2 treated with a total of 4574 bbls of slickwater and 151020 lbs of 30/50 proppant. | Total fluid used in treatment (bbls): | 4574 | Max pressure during treatment (psi): | 6500 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | 151020 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7496 ft. | # Of Holes: | 63 | Interval Bottom: | 7517 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 6/28/2014 Interval Top: 7273 ft. Interval Bottom: 7970 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 6/17/2014 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/27/2013 | Treatment End Date: | 8/27/2013 | Treatment Summary: | Treated with a total of 13377 bbls of slickwater and 459600 lbs of 30/50 proppant. | Total fluid used in treatment (bbls): | 13377 | Max pressure during treatment (psi): | 6500 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 3 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.79 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 300 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 459600 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7917 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/28/2014 | Test Method: | Flows from well | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 120 | BTU_GAS | 1298 | CALC_BBLS_H2O | 15 | CALC_BBLS_OIL | 120 | CALC_GOR | 3558 | CALC_MCF_GAS | 427 | CASING_PRESS | 1194 | GRAVITY_OIL | 50 | MCF_GAS | 427 | TUBING_PRESS | 822 |
| Perforation Data: | Interval Top: | 7273 ft. | # Of Holes: | 222 | Interval Bottom: | 7970 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/1/2024 Interval Top: 7273 ft. Interval Bottom: 7517 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/17/2014 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7273 ft. | # Of Holes: | 147 | Interval Bottom: | 7517 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/21/2017 Interval Top: 7273 ft. Interval Bottom: 7294 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/17/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/27/2013 | Treatment End Date: | 8/27/2013 | Treatment Summary: | Stage 3 treated with 4505 bbls of slickwater and 149780 lbs of 30/50 proppant. | Total fluid used in treatment (bbls): | 4505 | Max pressure during treatment (psi): | 6500 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.85 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | 149780 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7273 ft. | # Of Holes: | 84 | Interval Bottom: | 7294 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 10/01/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|