Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33893
Well Classification: OW Status: PA - 10/1/2024
Well Name/No:NORTH RINN #0-4-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/1/2024
FacilityID:424118LocationID:424105
County:WELD #123Location:SWSW 9 2N68W 6
Field:WATTENBERG - #90750Elevation:4866 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1160FSL  1133 FWLLat/Long: 40.149170 / -105.013520Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.149189 / -105.013534Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/31/2013
End Date: 8/31/2013
Reported: 3/19/2014
Days to report: 200
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/1/2024             Measured TD: 8319 ft.    Vertical TD: 7979 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/17/2015
Proposed Top PZ Location:Sec:9 Twp: 2N 68W Footage: 2550 FSL  40 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 2555 FSL  55 FWL
Proposed Depth/Form:8248 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 273, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8248 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 172, Top: 7178 ft., Bottom: 8248 ft.

Wellbore Completed
Completion Date:7/24/2013
Spud Date:6/22/2013Spud Date Is:ACTUAL
Measured TD:8319 ft.Measured PB depth:8286 ft.
True Vertical TD:7979 ft.True Vertical PB depth:7946 ft.
Top PZ Location:Sec:9 Twp: 2N 68WFootage: 2550 FSL  40 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68WFootage: 2555 FSL  55 FWL
Log Types:CBL/(Triple Combo run in API: 123-33895)
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 55 ft., Weight: 62 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 55 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 798 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 808 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8309 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 3244 ft., Bottom: 8319 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4386 ft.
NIOBRARA7446 ft.
CODELL7702 ft.
J SAND8139 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 10/1/2024                 Interval Top: 8143 ft.    Interval Bottom: 8172 ft.

 Completed Information for Formation J SAND
1st Production Date:6/18/2014Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/31/2013Treatment End Date:8/31/2013
Treatment Summary:Stage 1 treated with 4487 bbls of slickwater and 150940 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4487Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.74
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):150940Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8143 ft.# Of Holes:75
Interval Bottom:8172 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/21/2017                 Interval Top: 7702 ft.    Interval Bottom: 7725 ft.

 Completed Information for Formation CODELL
1st Production Date:6/18/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/31/2013Treatment End Date:8/31/2013
Treatment Summary:Stage 2 treated with 4458 bbls of slickwater and 149960 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4458Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):149960Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7702 ft.# Of Holes:69
Interval Bottom:7725 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 6/27/2014                 Interval Top: 7501 ft.    Interval Bottom: 8172 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/18/2014Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/31/2013Treatment End Date:8/31/2013
Treatment Summary:Treated with 13396 bbls of slickwater and 448540 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):13396Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):750
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):448540Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8127 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/2014Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 166
BTU_GAS 1298
CALC_BBLS_H2O 30
CALC_BBLS_OIL 166
CALC_GOR 3855
CALC_MCF_GAS 640
CASING_PRESS 1407
GRAVITY_OIL 50
MCF_GAS 640
TUBING_PRESS 1001
Perforation Data:
Interval Top:7501 ft.# Of Holes:208
Interval Bottom:8172 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/1/2024                 Interval Top: 7501 ft.    Interval Bottom: 7725 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/18/2014Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7501 ft.# Of Holes:133
Interval Bottom:7725 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/21/2017                 Interval Top: 7501 ft.    Interval Bottom: 7517 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/18/2014Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/31/2013Treatment End Date:8/31/2013
Treatment Summary:Stage 3 treated with 4451 of slickwater and 147640 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4451Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):147640Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7501 ft.# Of Holes:64
Interval Bottom:7517 ft.Hole Size:0.042 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/01/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No