Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33890
Well Classification: OW Status: PA - 10/1/2024
Well Name/No:NORTH RINN #0-8-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/1/2024
FacilityID:424115LocationID:424105
County:WELD #123Location:SWSW 9 2N68W 6
Field:WATTENBERG - #90750Elevation:4866 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1130FSL  1133 FWLLat/Long: 40.149090 / -105.013520Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.149103 / -105.013537Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/28/2013
End Date: 8/28/2013
Reported: 10/25/2013
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/1/2024             Measured TD: 8232 ft.    Vertical TD: 7975 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/17/2015
Proposed Top PZ Location:Sec:9 Twp: 2N 68W Footage: 18 FSL  17 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 12 FSL  19 FWL
Proposed Depth/Form:8167 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 273, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8167 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 167, Top: 7127 ft., Bottom: 8167 ft.

Wellbore Completed
Completion Date:7/11/2013
Spud Date:6/20/2013Spud Date Is:ACTUAL
Measured TD:8232 ft.Measured PB depth:8166 ft.
True Vertical TD:7975 ft.True Vertical PB depth:7909 ft.
Top PZ Location:Sec:9 Twp: 2N 68WFootage: 18 FSL  17 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68WFootage: 12 FSL  19 FWL
Log Types:CBL/(Triple Combo run in API: 123-33895)
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 55 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 55 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 799 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 809 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8222 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 3450 ft., Bottom: 8232 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4294 ft.
NIOBRARA7375 ft.
CODELL7646 ft.
J SAND8081 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 10/1/2024                 Interval Top: 8082 ft.    Interval Bottom: 8113 ft.

 Completed Information for Formation J SAND
1st Production Date:6/27/2014Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:8/28/2013
Treatment Summary:Stage 1 treated with 4423 bbls of slickwater and 149840 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4423Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.74
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):149840Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8082 ft.# Of Holes:75
Interval Bottom:8113 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/21/2017                 Interval Top: 7648 ft.    Interval Bottom: 7670 ft.

 Completed Information for Formation CODELL
1st Production Date:6/27/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:8/28/2013
Treatment Summary:Stage 2 treated with 4411 bbls of slickwater and 157020 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4411Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):157020Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7648 ft.# Of Holes:66
Interval Bottom:7670 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 7/3/2014                  Interval Top: 7515 ft.    Interval Bottom: 8113 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/27/2014Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:8/28/2013
Treatment Summary:Treated with 13476 bbls of slickwater and 455940 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):13476Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):600
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):455940Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8042 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/3/2014Test Method:flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 55
BTU_GAS 1298
CALC_BBLS_H2O 10
CALC_BBLS_OIL 55
CALC_GOR 8255
CALC_MCF_GAS 454
CASING_PRESS 2179
GRAVITY_OIL 50
MCF_GAS 454
TUBING_PRESS 1570
Perforation Data:
Interval Top:7515 ft.# Of Holes:221
Interval Bottom:8113 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/1/2024                 Interval Top: 7515 ft.    Interval Bottom: 7670 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/27/2014Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7515 ft.# Of Holes:146
Interval Bottom:7670 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/21/2017                 Interval Top: 7515 ft.    Interval Bottom: 7535 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/27/2014Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2013Treatment End Date:8/28/2013
Treatment Summary:Stage 3 treated with 4642 bbls of slickwater and 149080 lbs of 30/50 proppant.
Total fluid used in treatment (bbls):4642Max pressure during treatment (psi):6500
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):149080Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7515 ft.# Of Holes:80
Interval Bottom:7535 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/01/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No