|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/1/2024 Measured TD: 8198 ft. Vertical TD: 7998 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/17/2015 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 68W | Footage: 2560 FSL 1366 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 68W | Footage: 2571 FSL 1375 FWL | | Proposed Depth/Form: | 8151 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 273, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8151 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 169, Top: 7101 ft., Bottom: 8151 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/1/2013 | | Spud Date: | 6/24/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8198 ft. | Measured PB depth: | 8166 ft. | | True Vertical TD: | 7998 ft. | True Vertical PB depth: | 7966 ft. | | Top PZ Location: | Sec:9 Twp: 2N 68W | Footage: 2560 FSL 1366 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 68W | Footage: 2571 FSL 1375 FWL | | Log Types: | CBL/Triple Combo | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 55 ft., Weight: 62 , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 0 ft., Bottom: 55 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 798 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 808 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8188 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 3250 ft., Bottom: 8198 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4071 ft. | | | | | NIOBRARA | 7107 ft. | | | | | CODELL | 7382 ft. | | | | | J SAND | 7828 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/1/2024 Interval Top: 8010 ft. Interval Bottom: 8040 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/28/2014 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/2/2013 | Treatment End Date: | 9/2/2013 | | Treatment Summary: | Stage 1 treated with 4467 bbls of slickwater and 149260 lbs of 30/50 proppant. | | Total fluid used in treatment (bbls): | 4467 | Max pressure during treatment (psi): | 6500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.75 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | 149260 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8010 ft. | # Of Holes: | 75 | | Interval Bottom: | 8040 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/21/2017 Interval Top: 7584 ft. Interval Bottom: 7603 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/28/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/2/2013 | Treatment End Date: | 9/2/2013 | | Treatment Summary: | Stage 2 treated with 4423 bbls of slickwater and 153450 lbs of 30/50 proppant. | | Total fluid used in treatment (bbls): | 4423 | Max pressure during treatment (psi): | 6500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | 153450 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7584 ft. | # Of Holes: | 57 | | Interval Bottom: | 7603 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/5/2014 Interval Top: 7371 ft. Interval Bottom: 8040 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/28/2014 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/2/2013 | Treatment End Date: | 9/2/2013 | | Treatment Summary: | Treated with 13496 bbls of slickwater and 456240 lbs of 30/50 proppant. | | Total fluid used in treatment (bbls): | 13496 | Max pressure during treatment (psi): | 6500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 3 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 700 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 456240 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7992 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/5/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 26 | | BBLS_OIL | 79 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 26 | | CALC_BBLS_OIL | 79 | | CALC_GOR | 5278 | | CALC_MCF_GAS | 417 | | CASING_PRESS | 1935 | | GRAVITY_OIL | 50 | | MCF_GAS | 417 | | TUBING_PRESS | 1430 |
| | Perforation Data: | | Interval Top: | 7371 ft. | # Of Holes: | 208 | | Interval Bottom: | 8040 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/1/2024 Interval Top: 7371 ft. Interval Bottom: 7603 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/28/2014 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7371 ft. | # Of Holes: | 133 | | Interval Bottom: | 7603 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/21/2017 Interval Top: 7371 ft. Interval Bottom: 7390 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/28/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/2/2013 | Treatment End Date: | 9/2/2013 | | Treatment Summary: | Stage 3 treated with 4606 bbls of slickwater and 153530 lbs of 30/50 proppant. | | Total fluid used in treatment (bbls): | 4606 | Max pressure during treatment (psi): | 6500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | 153530 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7371 ft. | # Of Holes: | 76 | | Interval Bottom: | 7390 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/01/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|