|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/12/2018 Measured TD: 8216 ft. Vertical TD: 8066 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/12/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/28/2013 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 1320 FNL 50 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 1320 FNL 50 FEL | | Proposed Depth/Form: | 8171 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-430 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 660 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 462, Top: 0 ft., Bottom: 660 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8171 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8171 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/6/2012 | | Spud Date: | 3/3/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8216 ft. | Measured PB depth: | 8183 ft. | | True Vertical TD: | 8066 ft. | True Vertical PB depth: | 8033 ft. | | Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 1313 FNL 39 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 1304 FNL 30 FEL | | Log Types: | CBL; NO OPEN HOLE LOGS RUN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 460, Top: 0 ft., Bottom: 725 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8206 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 44, Top: 7970 ft., Bottom: 8206 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 7943 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1006, Top: 500 ft., Bottom: 7948 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 518 ft., Depth: 7944 ft., Bottom: 7944 ft., Sacks: 1006, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4052 ft. | | | | | SUSSEX | 4434 ft. | | | | | SHANNON | 5050 ft. | | | | | NIOBRARA | 7325 ft. | | | | | FORT HAYS | 7601 ft. | | | | | CODELL | 7604 ft. | | | | | J SAND | 8042 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 6/7/2012 Interval Top: 7604 ft. Interval Bottom: 7622 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/9/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2012 | | Treatment Summary: | PERF CODL 7604-7622 HOLES 54 SIZE .38
Frac CODL down 4.5" casing w/ 201,785 gal slickwater w/ 150,000# 40/70, 4,000# 20/40.
Broke @ 3,755 psi @ 4.9 bpm. ATP=4,857 psi; MTP=5,349 psi; ATR=59.8 bpm; ISDP=3,394 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7604 ft. | # Of Holes: | 54 | | Interval Bottom: | 7622 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 4/12/2018 Interval Top: 7396 ft. Interval Bottom: 7622 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/9/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/26/2012 | | Treatment Summary: | PERF NBRR 7396-7478 HOLES 60 SIZE .42
PERF CODL 7604-7622 HOLES 54 SIZE .38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | BTU_GAS | 1310 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 2400 | | CALC_MCF_GAS | 48 | | CASING_PRESS | 1637 | | GRAVITY_OIL | 49 | | MCF_GAS | 48 |
| | Perforation Data: | | Interval Top: | 7396 ft. | # Of Holes: | 114 | | Interval Bottom: | 7622 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/7/2012 Interval Top: 7396 ft. Interval Bottom: 7478 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/9/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/26/2012 | | Treatment Summary: | PERF NBRR 7396-7478 HOLES 60 SIZE .42
Frac NBRR down 4.5" casing w/ 250 gal 15% HCl & 235,958 gal slickwater w/ 200,820# 40/70, 4,000# 20/40.
Broke @ 3,462 psi @ 4.8 bpm. ATP=4,654 psi; MTP=5,346 psi; ATR=61.5 bpm; ISDP=3,341 psi
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7396 ft. | # Of Holes: | 60 | | Interval Bottom: | 7478 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/12/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|