Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33791
Well Classification: OW Status: PA - 4/10/2018
Well Name/No:STREAR #27-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/10/2018
FacilityID:423917LocationID:319164
County:WELD #123Location:NENE 10 2N67W 6
Field:WATTENBERG - #90750Elevation:4923 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:994FNL  1146 FELLat/Long: 40.157132 / -104.871242Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.157136 / -104.871236Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/3/2012
End Date: 5/3/2012
Reported: 5/24/2012
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/10/2018             Measured TD: 8179 ft.    Vertical TD: 8060 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/10/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/28/2013
Proposed Top PZ Location:Sec:10 Twp: 2N 67W Footage: 50 FNL  1310 FEL
Bottom Hole Location:Sec:10 Twp: 2N 67W Footage: 50 FNL  1310 FEL
Proposed Depth/Form:8138 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-430 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:3/15/2012
Spud Date:3/11/2012Spud Date Is:ACTUAL
Measured TD:8179 ft.Measured PB depth:8147 ft.
True Vertical TD:8060 ft.True Vertical PB depth:8028 ft.
Top PZ Location:Sec:10 Twp: 2N 67WFootage: 41 FNL  1313 FEL
Bottom Hole Location:Sec:10 Twp: 2N 67WFootage: 32 FNL  1308 FEL
Log Types:CBL; NO OPEN HOLE LOGS RUN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 728 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 728 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8169 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 7942 ft., Bottom: 8169 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7905 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1003, Top: 444 ft., Bottom: 7910 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 7905 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1003, Top: 444 ft., Bottom: 7910 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4065 ft.
SUSSEX4454 ft.
SHANNON5010 ft.
NIOBRARA7343 ft.
CODELL7580 ft.
FORT HAYS7582 ft.
J SAND8038 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/19/2012                 Interval Top: 7580 ft.    Interval Bottom: 7596 ft.

 Completed Information for Formation CODELL
1st Production Date:5/8/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2012
Treatment Summary:PERF CODL 7580-7596 HOLES 64 SIZE .38 Frac CODL down 4.5" casing w/ 194,208 gal slickwater w/ 150,360# 40/70, 4,000# 20/40. Broke @ 3,284 psi @ 4.8 bpm. ATP=4,699 psi; MTP=4,803 psi; ATR=59.6 bpm; ISDP=3,331 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7580 ft.# Of Holes:64
Interval Bottom:7596 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/10/2018                 Interval Top: 7372 ft.    Interval Bottom: 7596 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/9/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/3/2012
Treatment Summary:PERF NBRR 7372-7454 HOLES 60 SIZE .47 PERF CODL 7580-7596 HOLES 64 SIZE .38
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 20
BTU_GAS 1310
CALC_BBLS_OIL 20
CALC_GOR 50
CALC_MCF_GAS 1
CASING_PRESS 1672
GRAVITY_OIL 49
MCF_GAS 1
Perforation Data:
Interval Top:7372 ft.# Of Holes:124
Interval Bottom:7596 ft.Hole Size:0.47 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/19/2012                 Interval Top: 7372 ft.    Interval Bottom: 7454 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/9/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2012
Treatment Summary:PERF NBRR 7372-7454 HOLES 60 SIZE .47 Frac NBRR down 4.5" casing w/ 250 gal 15% HCl & 240,494 gal slickwater w/ 199,920# 40/70, 4,000# 20/40. Broke @ 3,222 psi @ 4.8 bpm. ATP=4,710 psi; MTP=5,160 psi; ATR=59.5 bpm; ISDP=3,516 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7372 ft.# Of Holes:60
Interval Bottom:7454 ft.Hole Size:0.47 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/10/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No