|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/7/2017 Measured TD: 8150 ft. Vertical TD: 8086 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/7/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/28/2013 | Proposed Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 2130 FNL 2130 FWL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 2130 FNL 2130 FWL | Proposed Depth/Form: | 8138 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-433 , Unit Acreage: 160, Drill Unit: NW/4 | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: NW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 660 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 462, Top: 0 ft., Bottom: 660 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8138 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8138 ft. |
| | |
Wellbore Completed | Completion Date: | 10/10/2011 | Spud Date: | 10/6/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8150 ft. | Measured PB depth: | 8095 ft. | True Vertical TD: | 8086 ft. | True Vertical PB depth: | 8031 ft. | Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 2114 FNL 2119 FWL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 2106 N 2116 W | Log Types: | AC-TR-SD-DSN; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 680 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 680 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8114 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 44, Top: 7938 ft., Bottom: 8114 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 7920 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1042, Top: 1352 ft., Bottom: 7924 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1352 ft., Depth: 7920 ft., Bottom: 7922 ft., Sacks: 1042, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4062 ft. | 4250 ft. | | | SUSSEX | 4484 ft. | 4700 ft. | | | SHANNON | 5018 ft. | 5130 ft. | | | NIOBRARA | 7315 ft. | | | | FORT HAYS | 7552 ft. | | | | CODELL | 7575 ft. | | | | J SAND | 8009 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 12/28/2017 Interval Top: 8012 ft. Interval Bottom: 8050 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/21/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/15/2011 | Treatment Summary: | J S PERF 8012-8050 HOLES 58 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 141,540 gal Slickwater w/ 115,000# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8012 ft. | # Of Holes: | 58 | Interval Bottom: | 8050 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 12/26/2011 Interval Top: 7365 ft. Interval Bottom: 8050 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 12/21/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/15/2011 | Treatment Summary: | NB PERF 7365-7456 HOLES 64 SIZE 0.42
CD PERF 7576-7594 HOLES 54 SIZE 0.42
J S PERF 8012-8050 HOLES 58 SIZE 0.38 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7989 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/26/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 20 | BTU_GAS | 1334 | CALC_BBLS_OIL | 20 | CALC_GOR | 7500 | CALC_MCF_GAS | 150 | CASING_PRESS | 2075 | GRAVITY_OIL | 49 | MCF_GAS | 150 | TUBING_PRESS | 1300 |
| Perforation Data: | Interval Top: | 7365 ft. | # Of Holes: | 176 | Interval Bottom: | 8050 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/28/2017 Interval Top: 7365 ft. Interval Bottom: 7594 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/21/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/22/2011 | Treatment Summary: | NB PERF 7365-7456 HOLES 64 SIZE 0.42 CD PERF 7576-7594 HOLES 54 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 242,124 gal Slickwater w/ 200,250# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 202,482 gal Slickwater w/ 150,050# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7365 ft. | # Of Holes: | 118 | Interval Bottom: | 7594 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 12/28/2017 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|