|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/7/2017 Measured TD: 8295 ft. Vertical TD: 8101 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/7/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/28/2013 | Proposed Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 2585 FNL 2600 FEL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 2556 FNL 2607 FEL | Proposed Depth/Form: | 8260 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-433 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 660 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 462, Top: 0 ft., Bottom: 660 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8260 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8260 ft. |
| | |
Wellbore Completed | Completion Date: | 10/6/2011 | Spud Date: | 10/1/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8295 ft. | Measured PB depth: | 8271 ft. | True Vertical TD: | 8101 ft. | True Vertical PB depth: | 8077 ft. | Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 2585 FNL 2600 FEL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 2556 N 2607 E | Log Types: | CBL
NO OPEN HOLE LOGS FOR THIS WELL. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 676 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 676 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8288 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 44, Top: 8080 ft., Bottom: 8288 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8040 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1020, Top: 1340 ft., Bottom: 8040 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1340 ft., Depth: 8040 ft., Bottom: 8040 ft., Sacks: 1020, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7384 ft. | | | | FORT HAYS | 7660 ft. | | | | CODELL | 7702 ft. | | | | J SAND | 8138 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/13/2017 Interval Top: 8140 ft. Interval Bottom: 8180 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/21/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/15/2011 | Treatment Summary: | J S PERF 8140-8180 HOLES 58 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 146,748 gal Slickwater w/ 115,100# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8140 ft. | # Of Holes: | 58 | Interval Bottom: | 8180 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: Status: CM - 12/23/2011 Interval Top: 7506 ft. Interval Bottom: 8180 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 12/21/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/15/2011 | Treatment Summary: | NB PERF 7506-7590 HOLES 60 SIZE 0.42
CD PERF 7704-7724 HOLES 80 SIZE 0.42
J S PERF 8140-8180 HOLES 58 SIZE 0.38 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/23/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 20 | BTU_GAS | 1334 | CALC_BBLS_OIL | 20 | CALC_GOR | 3450 | CALC_MCF_GAS | 69 | CASING_PRESS | 1500 | GRAVITY_OIL | 49 | MCF_GAS | 69 |
| Perforation Data: | Interval Top: | 7506 ft. | # Of Holes: | 198 | Interval Bottom: | 8180 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/13/2017 Interval Top: 7506 ft. Interval Bottom: 7724 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/21/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/29/2011 | Treatment Summary: | NB PERF 7506-7590 HOLES 60 SIZE 0.42 CD PERF 7704-7724 HOLES 80 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 244,188 gal Slickwater w/ 201,140# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 193,860 gal Slickwater w/ 151,200# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7506 ft. | # Of Holes: | 140 | Interval Bottom: | 7724 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 10/13/2017 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|