|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2022 Measured TD: 8345 ft. Vertical TD: 8100 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/28/2013 | Proposed Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 50 FNL 1315 FWL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 50 FNL 1315 FWL | Proposed Depth/Form: | 8312 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-433 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 660 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 462, Top: 0 ft., Bottom: 660 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8312 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8312 ft. |
| | |
Wellbore Completed | Completion Date: | 9/22/2011 | Spud Date: | 9/17/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8345 ft. | Measured PB depth: | 8313 ft. | True Vertical TD: | 8100 ft. | True Vertical PB depth: | 8068 ft. | Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 51 FNL 1302 FWL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 55 N 1305 W | Log Types: | AC-TR-SD-DSN; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 701 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 440, Top: 0 ft., Bottom: 701 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8337 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 44, Top: 8086 ft., Bottom: 8337 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8072 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1027, Top: 1462 ft., Bottom: 8074 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1462 ft., Depth: 8070 ft., Bottom: 8070 ft., Sacks: 1027, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4137 ft. | 4350 ft. | | | SUSSEX | 4572 ft. | 4800 ft. | | | SHANNON | 5152 ft. | 5250 ft. | | | NIOBRARA | 7462 ft. | | | | FORT HAYS | 7699 ft. | | | | CODELL | 7722 ft. | | | | J SAND | 8158 ft. | | | |
Formation NB-CD Formation Classification: OW Status: SI - 3/1/2022 Interval Top: 7518 ft. Interval Bottom: 7738 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/21/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/9/2011 | Treatment Summary: | NB PERF 7518-7598 HOLES 64 SIZE 0.42 CD PERF 7722-7738 HOLES 64 SIZE 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 262,248 gal Slickwater w/ 187,260# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 200,424 gal Slickwater w/ 150,000# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/23/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 20 | BTU_GAS | 1334 | CALC_BBLS_OIL | 20 | CALC_GOR | 2000 | CALC_MCF_GAS | 40 | CASING_PRESS | 1700 | GRAVITY_OIL | 49 | MCF_GAS | 40 |
| Perforation Data: | Interval Top: | 7518 ft. | # Of Holes: | 128 | Interval Bottom: | 7738 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 02/28/2022 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|