|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/24/2019 Measured TD: 7385 ft. Vertical TD: 7242 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/24/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/28/2013 | Proposed Top PZ Location: | Sec:10 Twp: 5N 65W | Footage: 100 FSL 100 FWL | Bottom Hole Location: | Sec:10 Twp: 5N 65W | Footage: 100 FSL 100 FWL | Proposed Depth/Form: | 7319 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 405 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 400 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 400 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7319 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 0 ft., Bottom: 7319 ft. |
| | |
Wellbore Completed | Completion Date: | 8/24/2011 | Spud Date: | 8/19/2011 | Spud Date Is: | ACTUAL | Measured TD: | 7385 ft. | Measured PB depth: | 7326 ft. | True Vertical TD: | 7242 ft. | True Vertical PB depth: | 7183 ft. | Top PZ Location: | Sec:10 Twp: 5N 65W | Footage: 90 FSL 120 FWL | Bottom Hole Location: | Sec:10 Twp: 5N 65W | Footage: 89 S 122 W | Log Types: | DIL, FDC/CNL, CBL. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 454 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 380, Top: 0 ft., Bottom: 454 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7373 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 665, Top: 1210 ft., Bottom: 7373 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3682 ft. | 3770 ft. | | | SUSSEX | 4413 ft. | 4596 ft. | | | NIOBRARA | 6872 ft. | 7143 ft. | | | CODELL | 7172 ft. | 7192 ft. | | |
Formation CODL Formation Classification: OW Status: AB - 10/24/2019 Interval Top: 7176 ft. Interval Bottom: 7186 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/23/2011 | Treatment Summary: | FRAC'D WITH 3713 BBLS SLICK WATER AND VISTAR 22 GEL AND 250280# SAND. ATP 4152 PSI. ATP 26.9 BPM. ISDP 3624 PSI. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 75 | BTU_GAS | 1303 | CALC_BBLS_OIL | 75 | CALC_GOR | 6907 | CALC_MCF_GAS | 518 | CASING_PRESS | 2140 | GRAVITY_OIL | 55 | MCF_GAS | 518 |
| Perforation Data: | Interval Top: | 7176 ft. | # Of Holes: | 40 | Interval Bottom: | 7186 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 10/24/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|