|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/27/2019 Measured TD: 8471 ft. Vertical TD: 8338 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/27/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/23/2013 | | Proposed Top PZ Location: | Sec:29 Twp: 1N 67W | Footage: 60 FSL 1343 FEL | | Bottom Hole Location: | Sec:29 Twp: 1N 67W | Footage: 64 FSL 1340 FEL | | Proposed Depth/Form: | 8458 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 805, Top: 0 ft., Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8458 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8458 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/16/2011 | | Spud Date: | 9/13/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8471 ft. | Measured PB depth: | 8146 ft. | | True Vertical TD: | 8338 ft. | True Vertical PB depth: | 8013 ft. | | Top PZ Location: | Sec:29 Twp: 1N 67W | Footage: 60 FSL 1343 FEL | | Bottom Hole Location: | Sec:29 Twp: 1N 67W | Footage: 64 FSL 1340 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; P/E AILC-CNLD-ML-CL/CV-TC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1184 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 0 ft., Bottom: 1184 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8472 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 65, Top: 8190 ft., Bottom: 8472 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8173 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 989, Top: 710 ft., Bottom: 8180 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 949 ft., Depth: 8137 ft., Bottom: 8137 ft., Sacks: 991, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 715 ft., Depth: 8173 ft., Bottom: 8173 ft., Sacks: 989, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4472 ft. | | | | | SUSSEX | 4933 ft. | | | | | NIOBRARA | 7490 ft. | | | | | CODELL | 7920 ft. | | | | | J SAND | 8346 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 3/27/2019 Interval Top: 8372 ft. Interval Bottom: 8400 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/14/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8372 ft. | # Of Holes: | 48 | | Interval Bottom: | 8400 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: AB - 3/27/2019 Interval Top: 7922 ft. Interval Bottom: 7942 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/10/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/7/2012 | | Treatment Summary: | PERF CODL 7922-7942 HOLES 60 SIZE .38
Frac CODL down 4.5" casing w/ 192,654 gal slickwater w/ 150,040# 40/70, 4,000# 20/40.
Broke @ 5,012 psi @ 5.6 bpm. ATP=4,724 psi; MTP=5,072 psi; ATR=60.4 bpm; ISDP=3,307 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/10/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 25 | | BTU_GAS | 1301 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 1000 | | CALC_MCF_GAS | 25 | | CASING_PRESS | 462 | | GRAVITY_OIL | 47 | | MCF_GAS | 25 |
| | Perforation Data: | | Interval Top: | 7922 ft. | # Of Holes: | 60 | | Interval Bottom: | 7942 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/27/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|