|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/17/2020 Measured TD: 6109 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/17/2020 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 6/23/2013 | Prop Depth/Form: | 6710 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: unspaced , Unit Acreage: 80, Drill Unit: N/2NE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: unspaced , Unit Acreage: 160, Drill Unit: NE/4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 169, Top: 0 ft., Bottom: 500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6710 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 710, Top: , Bottom: 6710 ft. |
| | |
Wellbore Completed | Completion Date: | 10/3/2011 | Spud Date: | 9/30/2011 | Spud Date Is: | ACTUAL | Measured TD: | 6109 ft. | Measured PB depth: | 6054 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL
Triple Combo
| Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 15 ft., Depth: 551 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 237, Top: 0 ft., Bottom: 551 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 15 ft., Depth: 6099 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: 520, Top: 90 ft., Bottom: 6099 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2349 ft. | | | | PARKMAN | 3260 ft. | | | | TEEPEE BUTTES | 4965 ft. | | | | NIOBRARA | 5587 ft. | | | | FORT HAYS | 5886 ft. | | | | CODELL | 5907 ft. | | | |
Formation NB-CD Formation Classification: Status: AB - 8/26/2020 Interval Top: 5605 ft. Interval Bottom: 5921 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/30/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/4/2011 | Treatment Summary: |
Pumped 482,538 lbs of Ottawa Proppant and 266,873 gallons of 15% HCL, Slick Water and Silverstim. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5978 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/3/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 15 | BTU_GAS | 1360 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 15 | CALC_GOR | 1333 | CALC_MCF_GAS | 20 | CASING_PRESS | 28 | GRAVITY_OIL | 36 | MCF_GAS | 20 | TUBING_PRESS | 28 |
| Perforation Data: | Interval Top: | 5605 ft. | # Of Holes: | 88 | Interval Bottom: | 5921 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|