|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2020 Measured TD: 8965 ft. Vertical TD: 8418 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/23/2013 | Proposed Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 50 FNL 2590 FWL | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 50 FNL 2590 FWL | Proposed Depth/Form: | 8704 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8704 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8704 ft. |
| | |
Wellbore Completed | Completion Date: | 11/1/2011 | Spud Date: | 10/29/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8965 ft. | Measured PB depth: | 8937 ft. | True Vertical TD: | 8418 ft. | True Vertical PB depth: | 8390 ft. | Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 53 FNL 2582 FWL | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 47 N 2592 W | Log Types: | CBL; NO OPEN HOLE LOGS RUN | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1213 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 760, Top: 15 ft., Bottom: 1213 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8954 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 8640 ft., Bottom: 8604 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 500 ft., Depth: 8624 ft., Bottom: 8624 ft., Sacks: 1051, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4178 ft. | | | | SUSSEX | 4751 ft. | | | | NIOBRARA | 7966 ft. | | | | CODELL | 8384 ft. | | | | J SAND | 8809 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 9/21/2012 Interval Top: 8384 ft. Interval Bottom: 8407 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/10/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/7/2012 | Treatment Summary: | PERF CODL 8384-8407 HOLES 66 SIZE .38
CODL down casing w/ 251,580 gal slickwater w/ 150,000# 40/70, 4,000# SB Excel.
Broke @ 4,677 psi @ 3.5 bpm. ATP=4,604 psi; MTP=5,018 psi; ATR=60.3 bpm; ISDP=2,862 psi |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8384 ft. | # Of Holes: | 66 | Interval Bottom: | 8407 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 7966 ft. Interval Bottom: 8407 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/10/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/7/2012 | Treatment Summary: | PERF NBRR 7966-8248 HOLES 62 SIZE .42
PERF CODL 8384-8407 HOLES 66 SIZE .38 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/9/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | BTU_GAS | 1270 | CALC_BBLS_OIL | 2 | CALC_GOR | 25000 | CALC_MCF_GAS | 50 | CASING_PRESS | 1405 | GRAVITY_OIL | 46 | MCF_GAS | 50 |
| Perforation Data: | Interval Top: | 7966 ft. | # Of Holes: | 128 | Interval Bottom: | 8407 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/21/2012 Interval Top: 7966 ft. Interval Bottom: 8248 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/10/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/7/2012 | Treatment Summary: | PERF NBRR 7966-8248 HOLES 62 SIZE .42
Frac NBRR down casing w/ 252 gal 15% HCl & 259,056 gal slickwater w/ 200,490# 40/70, 4,600# SB Excel.
Broke @ 3,151 psi @ 3.7 bpm. ATP=4,340 psi; MTP=4,752 psi; ATR=59.3 bpm; ISDP=2,782 psi.
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7966 ft. | # Of Holes: | 62 | Interval Bottom: | 8248 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 11/30/2020 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|