|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2020 Measured TD: 8657 ft. Vertical TD: 8403 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/23/2013 | | Proposed Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 1320 FNL 2590 FWL | | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 1320 FNL 2590 FWL | | Proposed Depth/Form: | 8505 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 805, Top: 0 ft., Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8505 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8505 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/5/2011 | | Spud Date: | 11/1/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8657 ft. | Measured PB depth: | 8630 ft. | | True Vertical TD: | 8403 ft. | True Vertical PB depth: | 8376 ft. | | Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 1308 FNL 2602 FWL | | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 1304 FNL 2610 FWL | | Log Types: | CBL; NO OPEN HOLE LOGS | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1192 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 790, Top: 0 ft., Bottom: 1192 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8647 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 8370 ft., Bottom: 8647 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 684 ft., Depth: 8293 ft., Bottom: 8293 ft., Sacks: 1014, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4064 ft. | | | | | SUSSEX | 4617 ft. | | | | | NIOBRARA | 7670 ft. | | | | | FORT HAYS | 8053 ft. | | | | | CODELL | 8076 ft. | | | | | J SAND | 8507 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 8550 ft. Interval Bottom: 8566 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2011 | | Treatment Summary: | PERF JSND 8550-8566 HOLES 64 SIZE .42
Frac J-Sand down 4-1/2" Csg w/ 142,002 gal Slickwater w/ 114,980# 40/70, 4,000# SB Excel.
Broke @ 1,961 psi @ 3.1 bpm. ATP=2,086 psi; MTP=3,060 psi; ATR=35.8 bpm; ISDP=1,538 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8550 ft. | # Of Holes: | 64 | | Interval Bottom: | 8566 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/25/2012 Interval Top: 8092 ft. Interval Bottom: 8114 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/3/2012 | | Treatment Summary: | PERF CODL 8092-8114 HOLES 66 SIZE .42
Frac Codell down 4-1/2" Csg w/ 195,594 gal Slickwater w/ 151,620# 40/70, 4,000# SB Excel, 0# .
Broke @ 4,168 psi @ 5.3 bpm. ATP=4,289 psi; MTP=5,427 psi; ATR=59.7 bpm; ISDP=2,502 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8092 ft. | # Of Holes: | 66 | | Interval Bottom: | 8114 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/10/2012 Interval Top: 7672 ft. Interval Bottom: 8566 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/10/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 22 | | BTU_GAS | 1313 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 1773 | | CALC_MCF_GAS | 39 | | CASING_PRESS | 942 | | GRAVITY_OIL | 46 | | MCF_GAS | 39 |
| | Perforation Data: | | Interval Top: | 7672 ft. | # Of Holes: | 196 | | Interval Bottom: | 8566 ft. | Hole Size: | 0.47 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 7672 ft. Interval Bottom: 8114 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7672 ft. | # Of Holes: | 132 | | Interval Bottom: | 8114 ft. | Hole Size: | 0.47 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/25/2012 Interval Top: 7672 ft. Interval Bottom: 7948 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/3/2012 | | Treatment Summary: | PERF NBRR 7672-7948 HOLES 66 SIZE .47
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 229,028 gal Slickwater w/ 200,720# 40/70, 4,000# SB Excel, 0# . Broke @ 3,300 psi @ 4.5 bpm. ATP=4,120 psi; MTP=4,917 psi; ATR=57.3 bpm; ISDP=2,439 psi
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7672 ft. | # Of Holes: | 66 | | Interval Bottom: | 7948 ft. | Hole Size: | 0.47 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 11/30/2020 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|