|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2020 Measured TD: 8800 ft. Vertical TD: 8433 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/23/2013 | Proposed Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 660 FNL 660 FEL | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 660 FNL 660 FEL | Proposed Depth/Form: | 8524 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8524 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8524 ft. |
| | |
Wellbore Completed | Completion Date: | 10/25/2011 | Spud Date: | 10/21/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8800 ft. | Measured PB depth: | 8774 ft. | True Vertical TD: | 8433 ft. | True Vertical PB depth: | 8407 ft. | Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 636 FNL 705 FEL | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 624 N 692 E | Log Types: | P/E IFLEX AIT-LDT/CNT-TC; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1217 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 810, Top: 15 ft., Bottom: 1217 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8791 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 65, Top: 8420 ft., Bottom: 8791 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1370 ft., Depth: 8410 ft., Bottom: 8414 ft., Sacks: 1031, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4690 ft. | | | | SUSSEX | 5170 ft. | 5352 ft. | | | NIOBRARA | 7770 ft. | | | | FORT HAYS | 8179 ft. | | | | CODELL | 8200 ft. | | | | J SAND | 8630 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 8642 ft. Interval Bottom: 8666 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/30/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/22/2011 | Treatment Summary: | J S PERF 8642-8666 HOLES 64 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 142,128 gal Slickwater. No proppant used on this job. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8642 ft. | # Of Holes: | 64 | Interval Bottom: | 8666 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 1/31/2012 Interval Top: 7786 ft. Interval Bottom: 8666 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 1/30/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/22/2011 | Treatment Summary: | NB PERF 7786-8056 HOLES 66 SIZE 0.42
CD PERF 8202-8224 HOLES 66 SIZE 0.42
J S PERF 8642-8666 HOLES 64 SIZE 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/31/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 50 | BTU_GAS | 1313 | CALC_BBLS_OIL | 50 | CALC_GOR | 2000 | CALC_MCF_GAS | 100 | CASING_PRESS | 1400 | GRAVITY_OIL | 48 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7786 ft. | # Of Holes: | 196 | Interval Bottom: | 8666 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 7786 ft. Interval Bottom: 8224 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/30/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/6/2012 | Treatment Summary: | NB PERF 7786-8056 HOLES 66 SIZE 0.42 CD PERF 8202-8224 HOLES 66 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 241,878 gal Slickwater w/ 0# NA
Frac Codell down 4-1/2" Csg w/ 202,734 gal Slickwater. No proppant used on this job. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7786 ft. | # Of Holes: | 132 | Interval Bottom: | 8224 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 11/30/2020 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|