|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2020 Measured TD: 8481 ft. Vertical TD: 8402 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/23/2013 | Proposed Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 1980 FNL 660 FEL | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 1980 FNL 660 FEL | Proposed Depth/Form: | 8473 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8473 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8473 ft. |
| | |
Wellbore Completed | Completion Date: | 10/7/2011 | Spud Date: | 10/3/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8481 ft. | Measured PB depth: | 8441 ft. | True Vertical TD: | 8402 ft. | True Vertical PB depth: | 8363 ft. | Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 1970 FNL 653 FEL | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 1956 N 651 E | Log Types: | PRE FORM 5 | Log Types: | P/E AIT-CNLD-ML-TC-CV; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1215 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 800, Top: 15 ft., Bottom: 1215 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8465 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 65, Top: 8152 ft., Bottom: 8465 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1014 ft., Depth: 8141 ft., Bottom: 8141 ft., Sacks: 984, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 1950 ft., Depth: 8141 ft., Bottom: 8141 ft., Sacks: 984, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4446 ft. | | | | NIOBRARA | 7467 ft. | | | | CODELL | 7901 ft. | | | | J SAND | 8333 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 12/1/2020 Interval Top: 8340 ft. Interval Bottom: 8374 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/30/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/19/2011 | Treatment Summary: | J S PERF 8340-8374 HOLES 56 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,428 gal Slickwater w/ 115,860# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8340 ft. | # Of Holes: | 56 | Interval Bottom: | 8374 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/31/2012 Interval Top: 7488 ft. Interval Bottom: 8374 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 1/30/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/19/2011 | Treatment Summary: | NB PERF 7488-7768 HOLES 56 SIZE 0.42
CD PERF 7904-7924 HOLES 60 SIZE 0.42
J S PERF 8340-8374 HOLES 56 SIZE 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/31/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 50 | BTU_GAS | 1313 | CALC_BBLS_OIL | 50 | CALC_GOR | 2000 | CALC_MCF_GAS | 100 | CASING_PRESS | 1775 | GRAVITY_OIL | 48 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7488 ft. | # Of Holes: | 172 | Interval Bottom: | 8374 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 12/1/2020 Interval Top: 7488 ft. Interval Bottom: 7924 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/30/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/27/2011 | Treatment Summary: | NB PERF 7488-7768 HOLES 56 SIZE 0.42 CD PERF 7904-7924 HOLES 60 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 226,884 gal Slickwater w/ 202,290# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 210,993 gal Slickwater w/ 150,400# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7488 ft. | # Of Holes: | 116 | Interval Bottom: | 7924 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 11/30/2020 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|