|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2020 Measured TD: 8506 ft. Vertical TD: 8416 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/23/2013 | | Proposed Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 2217 FNL 2297 FEL | | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 2224 FNL 2302 FEL | | Proposed Depth/Form: | 8564 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 805, Top: , Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8564 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8564 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/8/2011 | | Spud Date: | 11/5/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8506 ft. | Measured PB depth: | 8457 ft. | | True Vertical TD: | 8416 ft. | True Vertical PB depth: | 8367 ft. | | Top PZ Location: | Sec:32 Twp: 1N 67W | Footage: 2217 FNL 2297 FEL | | Bottom Hole Location: | Sec:32 Twp: 1N 67W | Footage: 2224 FNL 2302 FEL | | Log Types: | CBL
NO OPEN HOLE LOGS. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1218 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 810, Top: 15 ft., Bottom: 1218 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8477 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 65, Top: 8136 ft., Bottom: 8477 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1600 ft., Depth: 8128 ft., Bottom: 8130 ft., Sacks: 992, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7488 ft. | | | | | CODELL | 7924 ft. | | | | | J SAND | 8356 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 5/1/2017 Interval Top: 8376 ft. Interval Bottom: 8392 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/30/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2011 | | Treatment Summary: | J S PERF 8376-8392 HOLES 64 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 147,787 gal Slickwater. No proppant used on this job. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8376 ft. | # Of Holes: | 64 | | Interval Bottom: | 8392 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 1/31/2012 Interval Top: 7488 ft. Interval Bottom: 8392 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/30/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2011 | | Treatment Summary: | NB PERF 7488-7770 HOLES 66 SIZE 0.47
CD PERF 7924-7946 HOLES 66 SIZE 0.42
J S PERF 8376-8392 HOLES 64 SIZE 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 50 | | BTU_GAS | 1313 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 48 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7488 ft. | # Of Holes: | 196 | | Interval Bottom: | 8392 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 7488 ft. Interval Bottom: 7946 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/30/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/13/2012 | | Treatment Summary: | NB PERF 7488-7770 HOLES 66 SIZE 0.47 CD PERF 7924-7946 HOLES 66 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 258,174 gal Slickwater. No proppant used on this job.
Frac Codell down 4-1/2" Csg w/ 199,920 gal Slickwater w/ 0# 40/70, 0# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7488 ft. | # Of Holes: | 132 | | Interval Bottom: | 7946 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 11/30/2020 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|