|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 12/12/2023 Measured TD: 7556 ft. Vertical TD: 7370 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 12/12/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/23/2013 | Proposed Top PZ Location: | Sec:4 Twp: 4N 66W | Footage: 2615 FSL 1320 FWL | Bottom Hole Location: | Sec:4 Twp: 4N 66W | Footage: 2615 FSL 1320 FWL | Proposed Depth/Form: | 7524 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 212, Top: 0 ft., Bottom: 500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7354 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 674, Top: , Bottom: 7354 ft. |
| | |
Wellbore Completed | Completion Date: | 8/18/2011 | Spud Date: | 8/14/2011 | Spud Date Is: | ACTUAL | Measured TD: | 7556 ft. | Measured PB depth: | 7502 ft. | True Vertical TD: | 7370 ft. | True Vertical PB depth: | 7316 ft. | Top PZ Location: | Sec:4 Twp: 4N 66W | Footage: 2670 FSL 1309 FWL | Bottom Hole Location: | Sec:4 Twp: 4N 66W | Footage: 2671 FSL 1309 FWL | Log Types: | CBL/GRL/CCL, ACL/TRL/SDL/DSNL. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 573 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 323, Top: 0 ft., Bottom: 573 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7546 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 615, Top: 1886 ft., Bottom: 7546 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7047 ft. | | | | FORT HAYS | 7361 ft. | | | | CODELL | 7383 ft. | | | | GREENHORN | 7466 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 10/18/2022 Interval Top: 7385 ft. Interval Bottom: 7401 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/22/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7385 ft. | # Of Holes: | 64 | Interval Bottom: | 7401 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/12/2023 Interval Top: 7066 ft. Interval Bottom: 7401 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/22/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/19/2011 | Treatment Summary: | Frac'd the Niobrara-Codell w/ 270848 gals of Silverstim and Slick Water with 493,500#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 15 | BTU_GAS | 1305 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 15 | CALC_GOR | 18066 | CALC_MCF_GAS | 271 | CASING_PRESS | 1600 | GRAVITY_OIL | 64 | MCF_GAS | 271 |
| Perforation Data: | Interval Top: | 7066 ft. | # Of Holes: | 112 | Interval Bottom: | 7401 ft. | Hole Size: | 0 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/18/2022 Interval Top: 7066 ft. Interval Bottom: 7199 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/22/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7066 ft. | # Of Holes: | 48 | Interval Bottom: | 7199 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
Reported Plugged | Y | 12/12/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|