|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/14/2021 Measured TD: 7660 ft. Vertical TD: 7376 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/14/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/23/2013 | Proposed Top PZ Location: | Sec:9 Twp: 4N 66W | Footage: 124 FNL 1561 FWL | Bottom Hole Location: | Sec:9 Twp: 4N 66W | Footage: 124 FNL 1562 FWL | Proposed Depth/Form: | 7640 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 212, Top: 0 ft., Bottom: 500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7371 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 676, Top: , Bottom: 7371 ft. |
| | |
Wellbore Completed | Completion Date: | 8/3/2011 | Spud Date: | 7/27/2011 | Spud Date Is: | ACTUAL | Measured TD: | 7660 ft. | Measured PB depth: | 7606 ft. | True Vertical TD: | 7376 ft. | True Vertical PB depth: | 7322 ft. | Top PZ Location: | Sec:9 Twp: 4N 66W | Footage: 124 FNL 1561 FWL | Bottom Hole Location: | Sec:9 Twp: 4N 66W | Footage: 124 FNL 1562 FWL | Log Types: | CBL/GRL/CCL, CDL/CNL/ML, HRIL. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 568 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 307, Top: 0 ft., Bottom: 568 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7650 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 625, Top: 1050 ft., Bottom: 7650 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4345 ft. | | | | SHANNON | 4750 ft. | | | | NIOBRARA | 7158 ft. | | | | FORT HAYS | 7472 ft. | | | | CODELL | 7494 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 3/25/2021 Interval Top: 7496 ft. Interval Bottom: 7512 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/22/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7496 ft. | # Of Holes: | 64 | Interval Bottom: | 7512 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/14/2021 Interval Top: 7176 ft. Interval Bottom: 7512 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/22/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/3/2011 | Treatment Summary: | Frac'd the Niobrara-Codell w/ 352292 gals of Silverstim and Slick Water with 196,000#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 62 | BTU_GAS | 1206 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 62 | CALC_GOR | 10274 | CALC_MCF_GAS | 637 | CASING_PRESS | 1650 | GRAVITY_OIL | 63 | MCF_GAS | 637 |
| Perforation Data: | Interval Top: | 7176 ft. | # Of Holes: | 112 | Interval Bottom: | 7512 ft. | Hole Size: | 0 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/25/2021 Interval Top: 7176 ft. Interval Bottom: 7310 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/22/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7176 ft. | # Of Holes: | 48 | Interval Bottom: | 7310 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
Reported Plugged | Y | 06/14/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|