|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/10/2019 Measured TD: 8264 ft. Vertical TD: 7978 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/10/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/4/2013 | | Proposed Top PZ Location: | Sec:18 Twp: 2N 65W | Footage: 50 FNL 2440 FEL | | Bottom Hole Location: | Sec:18 Twp: 2N 65W | Footage: 50 FNL 2440 FEL | | Proposed Depth/Form: | 8211 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8211 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8211 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/27/2011 | | Spud Date: | 7/23/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8264 ft. | Measured PB depth: | 8235 ft. | | True Vertical TD: | 7978 ft. | True Vertical PB depth: | 7949 ft. | | Top PZ Location: | Sec:18 Twp: 2N 65W | Footage: 71 FNL 2442 FEL | | Bottom Hole Location: | Sec:18 Twp: 2N 65W | Footage: 64 FNL 2425 FEL | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 950 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 950 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8254 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 232, Top: 6643 ft., Bottom: 8254 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5854 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 696, Top: 794 ft., Bottom: 5884 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 833 ft., Depth: 5854 ft., Bottom: 5882 ft., Sacks: 696, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4234 ft. | 4500 ft. | | | | SUSSEX | 4654 ft. | 4940 ft. | | | | NIOBRARA | 7434 ft. | | | | | FORT HAYS | 7628 ft. | | | | | CODELL | 7652 ft. | | | | | J SAND | 8091 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 6/10/2019 Interval Top: 8092 ft. Interval Bottom: 8150 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/29/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/12/2011 | | Treatment Summary: | J S PERF 8092-8150 HOLES 68 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 145,698 gal Slickwater w/ 116,660# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8092 ft. | # Of Holes: | 68 | | Interval Bottom: | 8150 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 9/30/2011 Interval Top: 7496 ft. Interval Bottom: 8150 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/29/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/12/2011 | | Treatment Summary: | NB PERF 7496-7562 HOLES 58 SIZE 0.47
CD PERF 7654-7670 HOLES 64 SIZE 0.42
J S PERF 8092-8150 HOLES 68 SIZE 0.42 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8068 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/30/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | BTU_GAS | 1249 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 3500 | | CALC_MCF_GAS | 70 | | CASING_PRESS | 987 | | GRAVITY_OIL | 49 | | MCF_GAS | 70 |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 190 | | Interval Bottom: | 8150 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/10/2019 Interval Top: 7496 ft. Interval Bottom: 7670 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/29/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/2011 | | Treatment Summary: | NB PERF 7496-7562 HOLES 58 SIZE 0.47 CD PERF 7654-7670 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 216,924 gal Slickwater w/ 164,080# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 198,954 gal Slickwater w/ 139,840# 40/70, 8,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 122 | | Interval Bottom: | 7670 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/10/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|