|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2025 Measured TD: 10856 ft. Vertical TD: 6418 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/28/2013 | | Proposed Top PZ Location: | Sec:21 Twp: 5N 63W | Footage: 2583 FSL 723 FWL | | Bottom Hole Location: | Sec:21 Twp: 5N 63W | Footage: 2634 FNL 535 FEL | | Proposed Depth/Form: | 10910 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 181, Top: 0 ft., Bottom: 550 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6867 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 1033, Top: , Bottom: 6867 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 5553 ft., Depth: 10910 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 7/30/2011 | | Spud Date: | 7/22/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 10856 ft. | Measured PB depth: | 10840 ft. | | True Vertical TD: | 6418 ft. | True Vertical PB depth: | 6402 ft. | | Top PZ Location: | Sec:21 Twp: 5N 63W | Footage: 2592 FSL 666 FWL | | Bottom Hole Location: | Sec:21 Twp: 5N 63W | Footage: 2616 FNL 540 FEL | | Log Types: | CBL/GRL/CCL/VDL. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 24 ft., Depth: 618 ft., Weight: 36.00 , Citings Type: ACTUAL | | Cement: | Sacks: 357, Top: 0 ft., Bottom: 628 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 24 ft., Depth: 6770 ft., Weight: 26.00 , Citings Type: ACTUAL | | Cement: | Sacks: 555, Top: 320 ft., Bottom: 6780 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5660 ft., Depth: 10850 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: 10850 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4159 ft. | | | | | SHANNON | 4732 ft. | | | | | NIOBRARA | 6651 ft. | | | |
Formation NBRR Formation Classification: Status: PR - 12/1/2025 Interval Top: 6916 ft. Interval Bottom: 10765 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/7/2011 | Choke Size: | 0.000 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/21/2011 | | Treatment Summary: | Frac'd the Niobrara w/ 3175452 gals of Silverstim and Slick Water with 4,362,868.9#'s of Ottawa sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/14/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 132 | | BBLS_OIL | 345 | | BTU_GAS | 1301 | | CALC_BBLS_H2O | 132 | | CALC_BBLS_OIL | 345 | | CALC_GOR | 2095 | | CALC_MCF_GAS | 723 | | CASING_PRESS | 1625 | | GRAVITY_OIL | 48 | | MCF_GAS | 723 | | TUBING_PRESS | 835 |
| | Perforation Data: | | Interval Top: | 6916 ft. | # Of Holes: | 0 | | Interval Bottom: | 10765 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 4469 |
| Total Gas Produced (MCF) | 35833 |
| GOR | 8018 |
| GOR Determination | BOE |
| Average BOE per Day | 29.119 |
| Average MCFE per Day | 168.891 |
| Federal Financial Assurance | i | |
|
|