|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 9/1/2022 Measured TD: 10048 ft. Vertical TD: 5786 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 9/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/24/2013 | Prop Depth/Form: | 9989 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: All | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 60 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1180 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 420, Top: 0 ft., Bottom: 1180 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6040 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 640, Top: 0 ft., Bottom: 6040 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5290 ft., Depth: 9989 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 5290 ft., Bottom: 9989 ft. |
| | |
Wellbore Completed | Completion Date: | 11/26/2012 | Spud Date: | 11/18/2012 | Spud Date Is: | ACTUAL | Measured TD: | 10048 ft. | Measured PB depth: | 10031 ft. | True Vertical TD: | 5786 ft. | True Vertical PB depth: | 5786 ft. | Top PZ Location: | Sec:28 Twp: 9N 58W | Footage: 886 FSL 671 FEL | Depth | Bottom Hole Location: | Sec:28 Twp: 9N 58W | Footage: 668 FNL 734 FEL | Depth | Log Types: | CBL/GR/MWD. | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 160, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 743 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 357, Top: 0 ft., Bottom: 743 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 6198 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 660, Top: 0 ft., Bottom: 6198 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6135 ft., Depth: 10033 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 3258 ft. | | | | SHANNON | 3914 ft. | | | | NIOBRARA | 5821 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 9/1/2022 Interval Top: 6328 ft. Interval Bottom: 9964 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/18/2012 | Choke Size: | 0.000 in. | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 12/12/2012 | Treatment End Date: | 12/12/2012 | Treatment Summary: | Frac'd the Niobrara w/ 2674008 gals of Silverstim and Slick Water with 2882050#'s of Ottawa sand. | Total fluid used in treatment (bbls): | 63666 | Max pressure during treatment (psi): | 6591 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 22 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.82 | Recycled water used in treatment (bbls): | 3133 | Total flowback volume recovered (bbls): | 6983 | Fresh water used in treatment (bbls): | 60533 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2882050 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6104 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/26/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 122 | BBLS_OIL | 235 | BTU_GAS | 1340 | CALC_BBLS_H2O | 122 | CALC_BBLS_OIL | 235 | CALC_GOR | 1187 | CALC_MCF_GAS | 279 | CASING_PRESS | 255 | GRAVITY_OIL | 40 | MCF_GAS | 279 | TUBING_PRESS | 247 |
| Perforation Data: | Interval Top: | 6328 ft. | # Of Holes: | 0 | Interval Bottom: | 9964 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 12/08/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 08/31/2022 |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|