Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33562
Well Classification: GW Status: PA - 6/30/2023
Well Name/No:ARISTOCRAT ANGUS #8-2-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/30/2023
FacilityID:423337LocationID:422974
County:WELD #123Location:Lot 1 4 3N65W 6
Field:WATTENBERG - #90750Elevation:4815 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:604FNL  1078 FELLat/Long: 40.259970 / -104.662710Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259974 / -104.662721Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/6/2012
End Date: 9/6/2012
Reported: 12/12/2012
Days to report: 97
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/30/2023             Measured TD: 7540 ft.    Vertical TD: 7374 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/30/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/23/2013
Proposed Top PZ Location:Sec:4 Twp: 3N 65W Footage: 1304 FNL  55 FEL
Bottom Hole Location:Sec:4 Twp: 3N 65W Footage: 1308 FNL  48 FEL
Proposed Depth/Form:7443 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 219, Top: 0 ft., Bottom: 600 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7443 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 101, Top: 6815 ft., Bottom: 7443 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4881 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 83, Top: 4281 ft., Bottom: 4881 ft.

Wellbore Completed
Completion Date:8/13/2012
Spud Date:8/8/2012Spud Date Is:ACTUAL
Measured TD:7540 ft.Measured PB depth:7520 ft.
True Vertical TD:7374 ft.True Vertical PB depth:7354 ft.
Top PZ Location:Sec:4 Twp: 3N 65WFootage: 1304 FNL  55 FEL
Bottom Hole Location:Sec:4 Twp: 3N 65WFootage: 1308 FNL  48 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 715 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 725 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7531 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 2965 ft., Bottom: 7531 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4536 ft.
NIOBRARA7065 ft.
CODELL7346 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/5/2013                  Interval Top: 7347 ft.    Interval Bottom: 7361 ft.

 Completed Information for Formation CODELL
1st Production Date:12/29/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/6/2012Treatment End Date:9/14/2012
Treatment Summary:Frac'd the Codell 7347-7361’ (42 holes) w/ 76,792 gal Hiway Hybrid cross linked gel containing 132,291 # 20/40 sand. 09-06-12
Total fluid used in treatment (bbls):2903Max pressure during treatment (psi):5696
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):2903Total flowback volume recovered (bbls):828
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):132291Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7347 ft.# Of Holes:42
Interval Bottom:7361 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/30/2023                 Interval Top: 7074 ft.    Interval Bottom: 7361 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/29/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/6/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7000'. 09-13-12 Drilled out CBP and CFP's to commingle the CDL-NBRR. 09-14-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7310 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/6/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 37
BTU_GAS 1369
CALC_BBLS_H2O 25
CALC_BBLS_OIL 37
CALC_GOR 28270
CALC_MCF_GAS 1046
CASING_PRESS 1684
GRAVITY_OIL 61
MCF_GAS 1046
TUBING_PRESS 932
Perforation Data:
Interval Top:7074 ft.# Of Holes:90
Interval Bottom:7361 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/5/2013                  Interval Top: 7074 ft.    Interval Bottom: 7143 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/29/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/6/2012Treatment End Date:9/14/2012
Treatment Summary:Set CFP @ 7190'. 09-06-12 Frac'd the Niobrara 7074-7080’, 7137-7143 (48 holes), w/ 98,324 gals Hiway Hybrid cross linked gel containing 136,951# 20/40 sand. 09-06-12
Total fluid used in treatment (bbls):3251Max pressure during treatment (psi):5923
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):3251Total flowback volume recovered (bbls):827
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):136951Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7074 ft.# Of Holes:48
Interval Bottom:7143 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/30/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No