Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33559
Well Classification: GW Status: PA - 11/14/2023
Well Name/No:ARISTOCRAT ANGUS #8-0-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/14/2023
FacilityID:423334LocationID:422974
County:WELD #123Location:Lot 1 4 3N65W 6
Field:WATTENBERG - #90750Elevation:4815 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:594FNL  1078 FELLat/Long: 40.259990 / -104.662710Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.260000 / -104.662721Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/6/2012
End Date: 9/6/2012
Reported: 12/12/2012
Days to report: 97
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/14/2023             Measured TD: 7925 ft.    Vertical TD: 7769 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/14/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/23/2013
Proposed Top PZ Location:Sec:4 Twp: 1N 65W Footage: 43 FNL  68 FEL
Bottom Hole Location:Sec:4 Twp: 1N 65W Footage: 46 FNL  62 FEL
Proposed Depth/Form:7421 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 219, Top: 0 ft., Bottom: 600 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7421 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 102, Top: 6788 ft., Bottom: 7421 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4890 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 83, Top: 4290 ft., Bottom: 4890 ft.

Wellbore Completed
Completion Date:8/19/2012
Spud Date:8/13/2012Spud Date Is:ACTUAL
Measured TD:7925 ft.Measured PB depth:7922 ft.
True Vertical TD:7769 ft.True Vertical PB depth:7766 ft.
Top PZ Location:Sec:4 Twp: 1N 65WFootage: 43 FNL  68 FEL
Bottom Hole Location:Sec:4 Twp: 1N 65WFootage: 46 FNL  62 FEL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 723 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 713 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7925 ft., Weight: 11.5 , Citings Type: ACTUAL
Cement:Sacks: 693, Top: 2990 ft., Bottom: 7910 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4531 ft.
NIOBRARA7028 ft.
CODELL7307 ft.
J SAND7763 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/14/2023                Interval Top: 7774 ft.    Interval Bottom: 7820 ft.

 Completed Information for Formation J SAND
1st Production Date:12/29/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/29/2012Treatment End Date:9/12/2012
Treatment Summary:Frac'd the J-Sand 7774-7780, 7801-7820, (50 holes)w/ 102,270 gal 18 # Hiway Hybrid cross linked gel containing 149,800 # 20/40 Sand. 09-05-12
Total fluid used in treatment (bbls):4493Max pressure during treatment (psi):4622
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.50
Recycled water used in treatment (bbls):4493Total flowback volume recovered (bbls):450
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):149800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7774 ft.# Of Holes:50
Interval Bottom:7820 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/5/2013                  Interval Top: 7308 ft.    Interval Bottom: 7322 ft.

 Completed Information for Formation CODELL
1st Production Date:12/29/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/29/2012Treatment End Date:9/12/2012
Treatment Summary:Set CFP @ 7370'. 09-05-12 Frac'd the Codell 7308'-7322’ (42 holes) w/ 76,769 gal 22# Hiway Hybrid cross linked gel containing 132,291 # 20/40 sand. 09-05-12
Total fluid used in treatment (bbls):2904Max pressure during treatment (psi):5475
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):2904Total flowback volume recovered (bbls):450
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):132291Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7308 ft.# Of Holes:42
Interval Bottom:7322 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/4/2013                  Interval Top: 7037 ft.    Interval Bottom: 7820 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:12/29/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/4/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 7000'. 09-11-12 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 09-12-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7745 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/4/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 25
BTU_GAS 1369
CALC_BBLS_H2O 14
CALC_BBLS_OIL 25
CALC_GOR 24280
CALC_MCF_GAS 607
CASING_PRESS 1278
GRAVITY_OIL 60
MCF_GAS 607
TUBING_PRESS 1019
Perforation Data:
Interval Top:7037 ft.# Of Holes:140
Interval Bottom:7820 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/14/2023                Interval Top: 7037 ft.    Interval Bottom: 7322 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/29/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7037 ft.# Of Holes:90
Interval Bottom:7322 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/5/2013                  Interval Top: 7037 ft.    Interval Bottom: 7109 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/29/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/29/2012Treatment End Date:9/12/2012
Treatment Summary:Set CFP @ 7150'. 09-05-12 Frac'd the Niobrara 7037'-7043’, 7103'-7109' (48 holes), w/ 93,275 gals 18 # Hiway Hybrid cross linked gel containing 132,896 # 30/50 sand. 09-06-12
Total fluid used in treatment (bbls):3306Max pressure during treatment (psi):5568
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):3306Total flowback volume recovered (bbls):450
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):132896Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7037 ft.# Of Holes:48
Interval Bottom:7109 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/14/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No