|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/3/2019 Measured TD: 7355 ft. Vertical TD: 7327 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/3/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/11/2013 | | Proposed Top PZ Location: | Sec:27 Twp: 5N 65W | Footage: 1323 FNL 70 FWL | | Bottom Hole Location: | Sec:27 Twp: 5N 65W | Footage: 1323 FNL 70 FWL | | Proposed Depth/Form: | 7332 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 570 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 570 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7332 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 6500 ft., Bottom: 7332 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/21/2012 | | Spud Date: | 3/16/2012 | Spud Date Is: | Actual | | Measured TD: | 7355 ft. | Measured PB depth: | 7340 ft. | | True Vertical TD: | 7327 ft. | True Vertical PB depth: | 6050 ft. | | Top PZ Location: | Sec:27 Twp: 5N 65W | Footage: 1323 FNL 70 FWL | | Bottom Hole Location: | Sec:27 Twp: 5N 65W | Footage: 1323 FNL 70 FWL | | Log Types: | LAS
Induction
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 608 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 608 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7340 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 595, Top: 2350 ft., Bottom: 7340 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2614 ft. | | | | | PARKMAN | 3738 ft. | | | | | SUSSEX | 4443 ft. | | | | | NIOBRARA | 6920 ft. | | | | | FORT HAYS | 7206 ft. | | | | | CODELL | 7227 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 10/29/2013 Interval Top: 7225 ft. Interval Bottom: 7240 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/2/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/29/2012 | | Treatment Summary: | Codell frac Slickwater Treatment
Codell frac Treatment Totals: Total 118,660 lbs 30/50 Ottawa, Pumped 0.5 ppa to 2.1 ppa in 2701 bbls of fluid. Total fluid pumped 4136.3 bbls. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7225 ft. | # Of Holes: | 39 | | Interval Bottom: | 7240 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/3/2019 Interval Top: 6935 ft. Interval Bottom: 7240 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 2 | | BTU_GAS | 1259 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 187500 | | CALC_MCF_GAS | 375 | | CASING_PRESS | 2250 | | GRAVITY_OIL | 52 | | MCF_GAS | 375 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 6935 ft. | # Of Holes: | 64 | | Interval Bottom: | 7240 ft. | Hole Size: | 0.35 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/29/2013 Interval Top: 6935 ft. Interval Bottom: 7070 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/2/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/29/2012 | | Treatment Summary: | Niobrara frac Slickwater Treatment
Codell frac Treatment Totals: Total 200,580 lbs 40/70 Ottawa, 4,000 lbs 20/40 SLC Pumped 0.6 ppa to 2.0 ppa in 4168 bbls of fluid. Total fluid pumped 5890.1 bbls. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6935 ft. | # Of Holes: | 25 | | Interval Bottom: | 7070 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/03/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|